Emergency Mechanized Bridge with 19m Span and 60-Ton Load Capacity for Disaster Response Infrastructure
Price:
1000USD ~ 2000USD Per ton
MOQ:
negotiation
Delivery Time:
negotiation
Brand:
Evercross
Product Description
Emergency Mechanized Bridge Overview
The emergency mechanized bridge system combines a deployable bridge structure with a specialized erecting vehicle, delivering rapid deployment capabilities for critical infrastructure restoration in disaster scenarios.
Key Technical Specifications
| Parameter | Specification |
|---|---|
| Maximum Span | 19 meters |
| Passable Width | 3.3 meters |
| Maximum Load Capacity | 60 tons (crawler vehicles) |
| Maximum Speed | 80 km/h |
| Operation Crew | 2 operators (remote control) |
Core Features & Capabilities
- Vehicle-bridge integrated structure for rapid deployment to disaster sites
- Remote-controlled operation by two personnel for enhanced safety
- Adjustable bridge deck height for versatile terrain adaptation
- Compatibility with other bridge equipment systems
- Self-propelled and self-withdrawal functionality
- High-strength construction supporting 60-ton loads
Primary Applications
This emergency bridge system is engineered for rapid response scenarios where conventional infrastructure has been compromised or is unavailable.
- Earthquake disaster response for restoring access to epicenter areas
- Crossing small-to-medium rivers, dry ditches, and swamp terrain
- Emergency rescue operations following bridge damage or road washouts
- Military and civilian support for overcoming natural obstacles
Operational Advantages
Enhanced Safety & Reliability
Mechanized operations minimize personnel exposure in hazardous environments while high-strength materials ensure structural integrity under demanding conditions.
Environmental Efficiency
Rapid deployment reduces energy consumption and environmental impact compared to traditional bridge construction methods.
Mobility & Flexibility
Self-propelled design enables direct site access without additional transport equipment, while quick withdrawal capability facilitates rapid redeployment to subsequent emergency locations.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO.,LTD.
Location
ROOM 403,NO.2 BUILDING,NO.269 TONGXIE ROAD,CHANGNING DISTRICT,SHANGHAI,CHINA
Contact Person
Libby Chen