Epoxy Anchor Adhesive Injection Mortar Resin - 360ml Two-Component Structural Reinforcement Chemical Anchor
Price:
Negotiation
MOQ:
300pcs
Delivery Time:
Within 10 days after deposit
Brand:
HUANGSHIKANG
Product Description
Product Overview
This two-component epoxy-based structural reinforcement adhesive provides exceptional bonding strength for construction anchoring applications. Designed as a chemical anchor system, it delivers durable and secure attachments in building, renovation, and infrastructure projects.
Technical Specifications
| Type | Two-component epoxy system |
|---|---|
| Product Name | Epoxy Rebar Planting Glue |
| Volume | 360ml |
| Certifications | MSDS, CE, ISO9001 |
Key Applications
- Strengthens and repairs concrete rebar and anchors
- Seals concrete or stone cracks for structural stability
- Secures heavy structures and equipment installations
- Anchors components in infrastructure projects
- Ensures firm door and window frame attachment
Performance Features
- Acid and alkali resistance for harsh environments
- Resilient against corrosive damage and chemical exposure
- Anti-aging capabilities for long-term durability
- High pull-out strength for secure anchoring
- Suitable for both vertical and horizontal installations
Installation Procedure
1. Drilling
Drill holes at designated positions using an electric drill according to design requirements.
2. Hole Cleaning
Use a brush or blower to remove dust and debris, then wipe hole walls with acetone or alcohol to ensure clean, dry surfaces.
3. Rebar Treatment
Remove rust and oil stains from rebar surface using a wire brush, then clean with acetone or alcohol.
4. Glue Mixing
Mix components A and B in specified proportions from product manual, stirring evenly.
5. Glue Injection
Inject well-stirred adhesive into holes using glue injector or syringe, filling approximately 2/3 of hole depth.
6. Rebar Implantation
Quickly insert treated rebar into hole, rotating to distribute glue evenly and expel air.
7. Curing and Maintenance
Avoid disturbing rebar during curing period. Under normal temperature, full curing typically requires several hours to several days.
Manufacturing Capability
Our factory brings 20 years of adhesive production experience across 40,000 square meters of facility space. With highly mechanized equipment and over 200 production and R&D personnel, we achieve daily output of 30,000 pieces. We support OEM/ODM services and offer cost-effective solutions.
Production Timeline
Sample orders: 1-3 days
Mass production: 7-10 workdays
Mass production: 7-10 workdays
Factory Images
Contact Information
| +86 13302391599 | |
| Telephone | +86 13302391599 |
| mangrove88@126.com |
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Guangzhou Mangrove Rubber Industry Co., Ltd.
Location
Room 502, No. 3 Wangting Road, Xinhua Street, Huadu District, Guangzhou
Contact Person
JACK