Fast Arrival Spray Waterproof Flexible Polyurethane Sealant PU Foam
Fast Arrival Spray Waterproof Flexible Polyurethane Sealant PU Foam
Where To Use: PU Foam is for all-season, all weather, multi-purpose use such as:
1.Mounting of window and door frames Sealing of all types of cracks and holes.
2.Insulation of water-pipe network, central heating.
3.Soundproofing of partition walls, car and boat cabins etc.
Product Features:
1. Excellent adhesion on most substrates.
2. Installation, fixing and insulating of door and window frames.
3. Filling and sealing of gaps, joint, openings and cavities.
4. Bonding and mounting
5. Installation the electrical outlets and water pipes.
6. Heat preservation, cold and sound insulation.
1, Remove the dust, greasy dirt on the surface before construction.
2, Spray a little water on construction surface when the humidity is below 50 degrees, otherwise the heartburn or punch phenomenon will appear .
3, The flow rate of the foam can be adjusted by the control panel.
4, Shake the container for 1 minute before using, connect material container with spray gun or spray pipe, the filler content is 1/2 of the gap.
5, Use dedicated cleaning agent to clean the gun Surface drying time is about 5 minutes, and it can be cut after 30 minutes, after 1 hour the foam
6, This product is not UV-proof, so it is suggested to be cut and coated after the foam curing (such as cement mortar, coatings,etc.)
7, Construction when temperature is lower than -10 ℃, to ensure the material can be exhausted and increase the foam expansion, it should be


1, Store the product in a dry, cool and atmospheric place with temperature under 45℃.
2, The after-use container is forbidden to be burnt or punctured.
3, There should be atmospheric condition in construction site, the constructor should wear work gloves and goggles, don’t be close to combustion
4, It is forbidden to invert or side lay in storage and transportation. (long inversion can cause valves blocking
5, This product contains micro harmful element, has certain stimulation to eyes, skin and respiratory system, In case the foam
Factory pictures
FAQ
Q1. When can I receive my products?
A1: Sample order need 1 - 3 days.
Mass production need 7- 10 workdays.
Q2. Can you send me samples for reference?
A2: Yes, we are glad to send you free samples.
Q3. Can you provide OEM service?
A3: Yes, and we can custom the volume and tube package.
Q4: Where is your factory? Can I visit it?
A4:Our factory locate in Guangdong Province, welcome to visit us anytime!
Q5: What is the payment term that you can provide?
A5: Sample 100% payment.
30% TT prepayment and 70% balance payment for mass order.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.


