High Rise Steel Structure Hangar Building - Prefabricated Metal Frame with 200sqm MOQ, 0.326-0.8mm Steel Panels
Price:
USD 40-85 Per Square meter
MOQ:
200 square meters
Delivery Time:
35-55 days
Brand:
KXD
Product Description
Product Overview
Customized high-rise prefabricated metal frame steel building structure hangar designed for industrial and aviation applications. Minimum order quantity starts at 200 square meters.
Technical Specifications
| Size (Length × Width × Eave Height) | Minimum 200 sqm, customizable dimensions |
| Structure Types | Single slope, Double slope, Multi slope; Single span, Double span, Multi span; Single floor, Double floors |
| Foundation System | Cement base with steel foundation bolts |
| Column & Beam Material | Q345 (S355JR) or Q235 (S235JR) steel with bolt connections; Straight or variable cross-section |
| Bracing System | X-type, V-type or other configurations using angle steel or round pipe |
| C/Z Purlin Sizes | C120-C320, Z100-Z200 |
| Roof & Wall Panels | Single steel sheet (0.326-0.8mm thickness) or Sandwich panel (50-100mm thickness) |
| Accessories | Semi-transparent skylight belts, ventilators, down pipes, galvanized gutters |
| Surface Treatment | 2-layer epoxy zinc rich primer and 2-layer antirust paint |
Quality Control Process
Step 1: Material Control
Strict verification of steel type, specifications, and quality compliance with design requirements. Selection of high-strength bolts, standard bolts, welding rods, wires, and fluxes according to steel specifications.
Step 2: Installation Methodology
Systematic installation process: anchor bolt leveling, column-beam connection, support system formation, and sequential span completion. Ensures precise column positioning, consistent elevation, and straight alignment.
Step 3: Technical Expertise
Certified welders and crane operators with extensive construction experience. Established quality assurance system with certified technical personnel.
Construction Preparation
- Technical Preparation: Development of installation technical plans using separate installation for single-layer structures and comprehensive installation for roof systems and multi-layer projects
- Equipment & Materials: Preparation of hoisting machinery, auxiliary equipment, steel components, welding materials, and fasteners
- Foundation Inspection: Leveling and elevation control, axis review and alignment marking, anchor bolt position and quality verification
- Component Preparation: Pre-cleaning of steel pillars and lifting components, numbering, and installation line marking
Product Gallery
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Qingdao KXD Steel Structure Co., Ltd
Location
NO. 15 CHANGJIANG ROAD, PINGDU, QINGDAO, SHANDONG
Contact Person
David