5P 250A Marine Electrical Bus Bar with M8 Stud Terminals for 300V AC/48V DC Power Distribution
Price:
USD7.5-14.5 / pc
MOQ:
10 pcs
Delivery Time:
5-8 days
Brand:
NEKEKE
Product Description
Product Overview
This 5-position 250A marine electrical bus bar with M8 stud terminals provides reliable power distribution for marine and vehicle electrical systems. Engineered with corrosion-resistant materials and protective features for demanding marine environments.
Technical Specifications
| Parameter | Specification |
|---|---|
| Product Name | Marine Bus Bar |
| Voltage Rating | 300V AC / 48V DC |
| Maximum Continuous Amperage | 250A DC |
| Terminal Material | Nickel-plated copper |
| Terminal Screws | M8 x 5 studs |
| Conductor Size | 12-28 AWG |
| Application | Distribution Line |
| Color Options | Black and Red |
Key Features
- High-quality nickel-plated brass contact plates for superior current conduction and corrosion resistance
- Robust nylon base providing outstanding electrical insulation and mechanical durability
- Stainless steel hardware resistant to rust in harsh marine environments
- Removable dustproof and waterproof cover for effective connection protection
- 5-stud M8 terminal design suitable for automobiles, RVs, boats, yachts, and power systems
- Maintenance recommendation: Apply nickel anti-seize compound to threads to minimize wear
Application Benefits
This power distribution block effectively organizes wiring systems by consolidating harnesses and neatly managing electrical connections within vehicles and marine vessels. The design ensures reliable performance while reducing installation complexity.
Product Images
Frequently Asked Questions
What are your packing terms?
Products are typically packaged in plain white boxes and brown cartons. Custom branding packaging available with proper trademark authorization.
What are your payment terms?
30% deposit via T/T with 70% balance before shipment. Product photos provided before final payment.
What are your delivery terms?
Available terms include EXW, FOB, CFR, CIF, and DDU.
What is your estimated delivery time?
Typically 15-60 days after receiving advance payment, depending on items and order quantities.
Can you manufacture products based on samples?
Yes, we can produce based on samples or technical drawings, including creating necessary molds and fixtures.
What is your policy regarding samples?
Samples available for in-stock items with customer responsible for sample fee and shipping costs.
Do you test all products before shipping?
Yes, we perform 100% testing on all products prior to delivery.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shenzhen Nekeke Industrial Co., Ltd.
Location
Building #143, Guihua Xincun, No. 160 Guihua Road,Guanlan Street,Longhua District,Shenzhen City,China
Contact Person
Jenny Lee