| Sign In | Join Free | My bjjsgy.com |
|
| Brand Name: HYCM TOWER CRANE | Certification: CE, ISO, GOST, CU-TR |
| Model Number: QTZ500(7550) Tower Crane | Minimum Order Quantity: 1 |
| Delivery Time: 60 days after receiving the deposit or origin LC | Payment Terms: TT, LC |
| Jinan Avitt International Trade Co., Ltd-HYCM Tower Crane [Shandong,China] | |
| Verified Supplier | |
| Brand Name: HYCM | Certification: CE, ISO, GOST, CU-TR |
| Model Number: QTZ5015 | Minimum Order Quantity: 1 set |
| Delivery Time: about 50 days after receiving the deposit | Payment Terms: 30% advance payment and balance before shipment or by copy of B/L |
| JINAN HUIYOU CONSTRUCTION MACHINERY CO., LTD [Shandong,China] | |
| Active Member | |
| Brand Name: HYCM | Certification: CE, ISO, GOST, CU-TR |
| Model Number: QTP5510 | Minimum Order Quantity: 1 set |
| Delivery Time: About 10-40 days after receiving the deposit or origin LC | Payment Terms: T/T, LC, Western Union or 30% deposit 70% before shipment |
| JINAN HUIYOU CONSTRUCTION MACHINERY CO., LTD [Shandong,China] | |
| Active Member | |
| Brand Name: Katop | Certification: CE, ISO9001 |
| Model Number: QTZ200(7020) | Minimum Order Quantity: 1 UNIT |
| Delivery Time: within 25 workdays after receipt the deposit | Payment Terms: 30%TT in deposit, the balance 70%TT before shipment or by LC at sight |
| Shandong Katop Machinery Co.,Ltd. [Shandong,China] | |
| Active Member | |
| Brand Name: Zoomlion、XCMG、Sany、Botham | Certification: ISO9001、CE |
| Minimum Order Quantity: 1 section | Delivery Time: 7-20 work days |
| Payment Terms: L/C T/T D/P | Transport Package: Assembled |
| Hunan Concrete Power Brothers Heavy Industry & Technology Co., Limited [Hunan,China] | |
| Verified Supplier | |
| Brand Name: Shacman | Certification: GS, RoHS, CE, ISO9001, ISO9001: 2000 |
| Model Number: SYT80(T5710-6) | Minimum Order Quantity: 1 set |
| Delivery Time: 15~20 Days | Payment Terms: TT, LC, DP |
| Hunan Jyfy Co., Ltd. [Hunan,China] | |
| Verified Supplier | |