Shandong Shante Heavy Industry Machinery Co., Ltd.
                                                                                                           
Verified Supplier
28 Years
Since 1998
Menu
Home Products Underground Mining Excavator

Underground Mining Excavator

China Power Supply System Tunnel Excavator Underground Mining Excavator for sale

Power Supply System Tunnel Excavator Underground Mining Excavator

Price: negotiate
MOQ: 1
Delivery Time: 5-8 day

Tunnel Excavator Working Principle of Mucking Loader Power supply system including high voltage cable, transformer,low voltage cable and electrical cabinet,connect power to electrical motor, which drive triple pump change electrical energy to hydraulic energy. While traveling, traveling motor drive crawler travel. While working, operate control handle in drive cab, reversing valve controlled by pilot system, and then control cylinder to work. Conveyor mechanism working

China Hydraulic Electric Excavator Underground Mining Excavator Environmentally Friendly for sale

Hydraulic Electric Excavator Underground Mining Excavator Environmentally Friendly

Price: negotiate
MOQ: 1
Delivery Time: 5-8 day

Electric Excavator Traveling mechanism • Traveling mechanism consists of left & right crawler beam, idler and hydraulic actuating device, driving wheel, thrust wheel, tension device, crawler device etc. Traveling device is on both side of equipment, to make the whole equipment to travel forward, backward, and turn around. • Inject grease to traveling stretching device, core bar of tension cylinder drive idle wheel to move forward, confirm the crawlers tension stretching

China Mucking Loader Tunnel Excavating Machine Underground Mining Excavator for sale

Mucking Loader Tunnel Excavating Machine Underground Mining Excavator

Price: negotiate
MOQ: 1
Delivery Time: 5-8 day

Tunnel Excavating Machine Overview of lubricating points - mucking loader: Position Description Frequency Interval 1 Lubrication for hole pin of rotary cylinder base 3 Daily/Every shift 2 Lubrication for upper master pin of boom bearing block 3 Daily/Every shift 3 Lubrication for pin hole of medium arm hydraulic oil cylinder rod 3 Daily/Every shift 4 Lubrication for lower master pin of small arm bearing block 3 Daily/Every shift 5 Master pin of main transmission mechanism

China Mini Tunnel Excavator Underground Mining Excavator High Efficiency Low Noise for sale

Mini Tunnel Excavator Underground Mining Excavator High Efficiency Low Noise

Price: negotiate
MOQ: 1
Delivery Time: 5-8 day

Mini Tunnel Excavator Daily servicing work For the daily servicing work, the following works shall be completed by specific operators: No. Check item 1 Check the tension of track/chain, left & right 2 Check joints and the base plate of track/chain, left & right 3 Check the mucking loader for oil leakage (The hose joint shall be firmly locked when any hose or hose joint is re-tightened, so as to avoid twisting) 4 Check the tension of triangle belt 5 (In order to avoid

China Energy Saving Crawler Underground Mining Excavator With Sledge Hammer for sale

Energy Saving Crawler Underground Mining Excavator With Sledge Hammer

Price: negotiate
MOQ: 1
Delivery Time: 5-8 day

Crawler Excavator It shall be ensured that the track is installed at the correct side. The protruding end of the base plate must be aligned to the chain wheel direction of head end in the lower track section. Connect the track end to the track end bolts. • Hammer the end bolts with sledge hammer, drive pin and conduit during installation without press. • Use a reverse fixing seat when hammering the end bolts in order to prevent damage to guide wheel and drive wheel bearing.

China Electric Mini Digger Underground Mining Excavator With Anti Corrosive Coating for sale

Electric Mini Digger Underground Mining Excavator With Anti Corrosive Coating

Price: negotiate
MOQ: 1
Delivery Time: 5-8 day

Electric Mini Digger Stop period • The piston rod must be coated with anti corrosive coating, and the air inlet and air outlet of air filter must be sealed. • All devices shall be preheated and test run for 15 min or so after stop for 6 months. • The protective measures must be taken after test run. 9.7.3 End of stop period The following steps shall be taken when the excavator is reused: • The anti corrosive coating must be removed from the piston rod. • The air inlet and air

China Underground Tunnel Repair And Maintenance Machine For Coal Mine for sale

Underground Tunnel Repair And Maintenance Machine For Coal Mine

Price: negotiate
MOQ: 1
Delivery Time: 5-8 day

Tunnel Repair And Maintenance Machine For Coal Mine Product Function and Application: It is a multi-function repair and maintanence equipment mainly used for coal road,half coal road and whole rock roadway in the caol tunnel. It can carry out daily maintainence of breaking and excavating and shoveling for tunnel roof and floor and ribs,and also breaking big rock into smaller to be convenient for loading. The machine have different action of excavation and side excavation and

1 2