Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
                                                                                                           
Verified Supplier
12 Years
Since 2014
Menu

zb200 S460J0 bs5400 HA+20hb Extra Wide Heavy Load Anti Skid Aggerates Bailey Bridge Long Span

Others
2024-07-12
Bailey Bridge Pained or Galvanized Temporary Steel Bridge three lane 10.5m Temporary Steel Bridge
Discover the ZB200 S460J0 BS5400 HA+20HB Extra Wide Heavy Load Anti Skid Aggerates Bailey Bridge Long Span, the ideal solution for rapid, durable, and versatile bridging needs. Perfect for permanent or temporary use, disaster relief, and rural infrastructure projects, this modular steel bridge offers a clear span of up to 60.96m with heavy load capacity.