Beijing Sinovo International & Sinovo Heavy Industry Co.Ltd.
                                                                                                           
Verified Supplier
24 Years
Since 2002
Menu
Machinery Welding Equipment Welding Turning Roll

TR1505 Hydraulic Casing Rotator For Road And Bridge Construction

Price Negotiable
Price: Negotiation
MOQ: 1 set
Delivery Time: 7-10 work days
Brand: SINOVO
Product Description

 

TR1505 Hydraulic Casing Rotator For Road And Bridge Construction

 

The TR1505 hydraulic casing rotator is a new type drill with the integration of the full hydraulic power and transmission, and the combination control of machine, power and fluid. The TR1505 hydraulic casing rotator is a new, environmentally-friendly and highly efficient drilling technology. In recent years, it is widely adopted in the projects such as the constructions of urban subway, articulation pile of deep foundation pit enclosure, clearance of waste piles ( underground obstructions ), high-speed rail, road and bridge, and urban construction piles, as well as the reinforcement of reservoir dam.

 

( 1 ) Foundation pile, continuous wall:

  • Foundation piles for high-speed rail, road and bridge and house building.
  • Articulation pile constructions which are required to be excavated, such as subway platforms, underground architectures, continuous walls
  • Water retaining wall of reservoir reinforcement.

( 2 ) Drilling gravels, boulders and karst caves

  • It is allowable to conduct the foundation pile construction at mountain lands with gravel and boulder formations.
  • It is allowable to conduct operation and cast the foundation piles at he thick quicksand formation and necking down stratum or the filling layer.
  • Conduct rock-socketed drilling to the rock stratum, cast the foundation pile.

( 3 ) Clear the underground obstructions

  • During the urban construction and bridge rebuilding, the obstructions such as the steel reinforced concrete pile, steel pipe pile, H steel pile, pc pile and wood pile can be cleared directly, and cast the foundation pile on the spot.

( 4 ) Cut the rock stratum

  • Conduct the rock-socketed drilling to the cast-in-place piles.
  • Drill through-holes on the rock bed (shafts and ventilation holes)

( 5 ) Deep excavation

  • Conduct the in-place casting or steel pipe pile inserting for the deep foundation improvement.
  • Excavate deep wells for construction use in the constructions of reservoir and tunnel.

 

Technical parameters of TR1505 hydraulic casing rotator

 

TR1505
Working device Diameter of drill hole mm Φ800-Φ1500
  Rotary torque KN.m 1500/975/600 Instantaneous 1800
  Rotary speed rpm 1.6/2.46/4.0
  Lower pressure of sleeve KN Max.360KN+Dead weight210KN
  Pulling force of sleeve KN 2444 Instantaneous 2690
  Pressure-pulling stroke mm 750
  Weight ton 31+(selection and installation of track)7
Hydraulic power station Engine model   ISUZU AA-6HK1XQP
  Engine Power Kw/rpm 183.9/2000
  Full consumption of engine g/kwh 226.6(when the maximum power rate)
  Weight ton 7
  Control mode   Wired remote control

 


The advantages of adopting the TR1505 hydraulic casing rotator


1. No noise, no vibration, and high safety;
2. Without mud, clean working surface, good environmental friendliness, avoiding the possibility for mud to enter the concrete, high pile quality, enhancing the bond stress of concrete to the steel bar;
3. During construction drilling, the characteristics of stratum and rock can be directly distinguished;
4. The drilling speed is fast and reaches about 14m/h for the general soil layer;
5. The drilling depth is large and reaches about 80m according to the situation of soil layer;
6. The hole forming verticality is easy to master, which can be accurate to 1/500;
7. No hole collapse will be caused, and the hole forming quality is high.
8. The hole forming diameter is standard, with little filling factor. Being compared with other hole forming methods, it can save a lot of concrete usage;
9. The hole clearing is thorough and fast. The drilling mud at the hole bottom can be clear to about 3.0cm.

 
 
Packaging & Delivery
Packaging Details
Standard packing or as to clients requirements
Lead Time :
Quantity(Sets) 1 - 1 >1
Est. Time(days) 30 To be negotiated
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Beijing Sinovo International & Sinovo Heavy Industry Co.Ltd.
Location Suite 2308, Huatengbeitang Building, No.37 Nanmofang Road, Chaoyang District, Beijing City. China
Contact Person Alan Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.