Walk In Blast Freezer Cold Roomfridge Air Cooler Cold Chamber Chiller For Warehouse
Specification
| Product Name | Polyurethane cold storage board | Advantage |
| Layout material | Various options | Can be selected according to needs |
| Customizable | Yes | Provide OEM / ODM |
| Density | 38~45kg/m³ | Better insulation effect |
| Self-extinguishing time | <7S | Better flame retardant effect |
| Thickness specifications | 50/75/100/120/150/200 mm | Can be selected according to needs |
| Flame retardant | B1,B2 | Better flame retardant effect |
| Brand | Famous | Famous manufacturers in China |
| Bending strength | >0.25mpa | High bending strength, not easy to deform |
| Compressive strength | >0.2mpa | High compressive strength, not easy to damage |
| Thermal Conductivity | <0.022W/NºC | Low thermal conductivity, better thermal insulation |
| Water absorption | <0.30kg/m³ | Better temperature isolation |

Advantages of Frozen Foods
1.Preserve the Freshness
Foods are stuffed with supplements and you can protect it’s essential vitamins, minerals and fibers from deterioration, which helps in keeping food products fresh and healthy.
2. Increase Shelf Life
Keeping a low temperature helps to limit decay and slow down the microbial growth, which make food items to use for longer time period.
3.Restricts Germs Formation
Low temperature ensures to restrict growth of food poisoning bacteria, which helps in keeping food product healthy and safe to eat.
4.Preserves Nutritional Values
Frozen food is typically allowed to fully ready to use and then frozen soon after processing, retaining much of it’s nutritional values like essential minerals and vitamins.
FAQ
1.You are manufacture factory or trading company?
We are manufacture factory. You are welcomed to visit us at any time. In the workshop,it has a complete advanced equipment system for making steel structures and panels. So we can make sure the good quality and also the competitive price.
2.How about your quality control?
Our products have passed CE EN1090 and ISO9001:2008.
3.Can you offer design service?
Yes,we have an engineer team and can design for you according to your requirements.Architectural drawing,structure diagram,processing detail drawing and installation drawing will be made and let you confirm in different time of the project.
4.What's the delivery time?
The delivery time depends on the size and quantity of building.Generally within 30 days after receiving the payment.And partial shipment is allowed for big order.
5.Do you offer service for installation?
We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if needed.
Factors to be considered for reduction of power consumption in frozen storage
- Select the optimized IDU and ODU as per the load condition.
- Select the compressor with VFD drive for power reduction purpose.
- Before storing, ensure that all the commodity freeze perfectly.
- Packing the frozen food perfectly for storage.
- Maintain the proper racking storage for perfect ventilation and cooling.
- Do not open the doors frequently.
- Select optimized puf panel thickness for proper insulation.
- Use optimized lighting system with less radiation inside the cold room.
- Don't keep unnecessary machineries inside the cold room.
- Install the cold room without any atmospheric air leakage.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

