CHINA HARZONE INDUSTRY CORP.,LTD.
                                                                                                           
Verified Supplier
59 Years
Since 1967
Menu

Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers

Price Negotiable
Price: Negotiable
MOQ: negotiation
Delivery Time: negotiation
Brand: Harzone
Product Description

Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers
                    
Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers is sort of emergency equipment carried by automobile and accomplishes erection and retrieval by erection vehicle.

 

Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers is mainly used to erect a bridge with a length of 21m long and a width of 3.3m to ensure all sorts of vehicles with a tracked load of up to 60 tons or an axle load of up to 17 tons to go across small medium rivers and dry gaps rapidly.  

                          
 Pictures of Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers

 

FAQ

1,How about quality control of your company?

Manufacturing process for steel bailey bridge in China,who has engaging in this line for over 50 years with an International Quality System Certification of ISO 9001:2015 and as cooperation partner with the research institutions of the People’s Liberation Army. And our products have been exported to more than 40 countries and regions in Asia,Africa,Latin America and Oceania.

 

2,Are you a factory or a trade company?

We are a factory with 8 production lines and various machines to fabricate steel bridge parts,pontoon bridges,mechanized bridges and other products.Also, we have get the exporting license to devote ourselves into global market.

 

3,Where is your loading port?

Shanghai Port,Nanjing Port,Tianjin Port.

                    

Specifications of Less Operators: 2-3 Wheeled Load-13t Mechanized Bridge

Tracked load / axle load

60t / 13t

Outline dimension (L*W*H)

13*3.3*3.6m

Bridge length 21m
Negotiating length (on hard banks) 19m

Gross weight

32.5t

Bridge weight

10.5t

Section length

10.63m

Bridge width (when expanding)

3.3m

Track width

1.15m

Section height

0.95m

End section height

0.35m

Operator

2-3

Erection time

10 min

Max. longitudinal slope / lateral slope

±10%  / ±5%

Allowable bank height difference

5%

 

 

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHINA HARZONE INDUSTRY CORP.,LTD.
Location No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Contact Person Sun Ruyu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.