CHINA HARZONE INDUSTRY CORP.,LTD.
                                                                                                           
Verified Supplier
59 Years
Since 1967
Menu

Length 54m Portable Foot Bridge Fast Erection Emergency Bridges

Price Negotiable
Price: Negotiated
MOQ: 1set
Delivery Time: Negotiable
Brand: Harzone
Product Description

Length 54m Tportable Foot Bridge Bridge Bailey Bridge

Length 54m Tportable Foot Bridge Bridge Bailey Bridge Description:

Length 54m Tportable Foot Bridge Bridge Bailey Bridge is moveable steel bridge ,It has been extensively used in several fields, the bridge most essential feature is to achieve a variety of spans, bear carrying capacity, light and handy components, easy to dismantle and strong adaptability can be rapidly accomplished with humble tools and manpower.

 

Length 54m Tportable Foot Bridge Bridge Bailey Bridge adopts modular design, featuring a large span,short construction period,fast erection, multiple reuses of bridge components. It has excellent interchangeability and connection ferformance. Length 54m Tportable Foot Bridge Bridge Bailey Bridge surface protection can be paint or hot-dip galvanized.

 

 

Length 54m Tportable Foot Bridge Bridge Bailey Bridge Specifications:

Type  CB100
Designed Span 6-60m
Designed Load HS25-44,Axle Load 20t,tracked load 50t
Panel Dimension 1.448*3.048m
Carriageway Width 4.2m/7.35m
Deck type steel deck/ wood deck

 

The simple component of Length 54m Tportable Foot Bridge Bridge Bailey Bridge contains of girder, deck, frame connecting structure, bridge end structure and gateway structure. The girder is combined of panel, panel pin (include safety circlip) and chord reinforcement. The deck is combined of transom, bridge plate and kerb. The frame structure is combined of raker, bracing frame, vertical frame, sway brace and vertical component. Length 54m Tportable Foot Bridge Bridge Bailey Bridge end section is combined of end post, lower bearing and frame plate. The gateway structure is combined of ramp, ramp bearing and end plate.

 

 

On May 12,2008, an 8.0-magnitude earthquake struck Wenchuan County, Sichuan Province. Roads in the quake-hit area were severely damaged and more than 400,000 people were trapped. The rapid construction of Zhouqiao and highway steel bridges became the first lifeline to the disaster area.

On May 18, Huazhou received a call from the General Staff and the National Development and Reform Commission to provide eight emergency steel bridges to the disaster area. It's a big responsibility. It's a great mission. Huazhou heavy industry to carry forward the military spirit, do not speak of any conditions, have the courage to assume China's transportation emergency support equipment as the first brand of social responsibility.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHINA HARZONE INDUSTRY CORP.,LTD.
Location No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Contact Person Sun Ruyu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.