CHINA HARZONE INDUSTRY CORP.,LTD.
                                                                                                           
Verified Supplier
59 Years
Since 1967
Menu

Operator 6-7 Men Mechanized Bridge Emergency

Price Negotiable
Price: Negotiable
MOQ: negotiation
Delivery Time: negotiation
Brand: Harzone
Product Description

Operator 6~7 Men (Not Including Drivers Of Transport Vehicles) Emergency Bridge Mechanized Bridge

 

Description of Operator 6~7 Men (Not Including Drivers Of Transport Vehicles) Emergency Bridge Mechanized Bridge​:                                                              
                                      

Operator 6~7 Men (Not Including Drivers Of Transport Vehicles) Emergency Bridge Mechanized Bridge is a set of mechanized bridge with big single span accepted by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.

 

Operator 6~7 Men (Not Including Drivers Of Transport Vehicles) Emergency Bridge Mechanized Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.

 

Specification of Operator 6~7 Men (Not Including Drivers Of Transport Vehicles) Emergency Bridge Mechanized Bridge​

Curb weight of erection vehicle (including 3 men)                                      32.5t

Curb weight of transport vehicle                                                     20.8t         

Bridge bay weight:                                                                  9.2t

Design load: tracked load                                                        LD-60

             Wheeled (load on axle)                                               LT-20

Erection length                                            17m, 25.5m, 34 m, 42.5 m, 51 m

Erection width                                                                      4m

Erection time (complete bridge)                                                    75min                                            

Retrieval time (complete bridge)                                                   75min

Operator                                6~7 men (not including drivers of transport vehicles)

 

Operator 6~7 Men (Not Including Drivers Of Transport Vehicles) Emergency Bridge Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.

China Harzone dedicates itself to the following fields:

Design and manufacturing of military bridges and emergency rescue equipment

Design,manufacturing and installation of various kinds of steel bridges and steel structures

Research and re-fitting of special-purpose vehicles and equipment

Engineering contracting

Import and Export trading business

 

Harzone products have been exported to more than 40 countries and regions around the world and own a good reputation from international client.Moreover,China Harzone has been listed in the state emergency purchasing system and also the largest qualified rescue machinery supplier of the United Nations Emergency Procurement.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHINA HARZONE INDUSTRY CORP.,LTD.
Location No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Contact Person Sun Ruyu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.