CHINA HARZONE INDUSTRY CORP.,LTD.
                                                                                                           
Verified Supplier
59 Years
Since 1967
Menu
Construction & Real Estate Metal Building Materials

High Mechanization Level Temporary Bridge 51m

Price Negotiable
Price: Negotiable
MOQ: negotiation
Delivery Time: negotiation
Brand: Harzone
Product Description

High Mechanization Level 51m Mechanized Bridge

 

Description of High Mechanization Level 51m Mechanized Bridge :                                                              

High Mechanization Level 51m Mechanized Bridge is a set of temporary large span bridge equipment carried by erection vehicle, accomplishing the erection and retrieval operation by the erection vehicle,which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.

 

High Mechanization Level 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.

 

High Mechanization Level 51m Mechanized Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.

 

Main data of High Mechanization Level 51m Mechanized Bridge​​:

 

 

No Item Data
1 Curb weight of erection vehicle 33t
2 Curb weight of transportation vehicle 21t
3 Load capacity  
  Tracked load 60T
Wheeled load 13T
4 Life time 10000 times
5 Erection length 17m,25.5m,34m,42.5m,51m
6 Erection width 4m
7 Negotiating depth: ±3m
8 Erection maximum longitudinal gradient 10%
9 Erection maximum transverse gradient 5%
10 Erection time (complete bridge) 90min
11 Retrieval time (complete bridge) 90min
12 Operator(not including driver) 3~4
13 Ambient temperature -41℃~+50℃

 

High Mechanization Level 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.

Harzone Industry was built in 1967, one of the subsidiary units of China State Shipbuilding Corporation Limited(CSSC), a state-owned and protected military company. Over the past four decades, the leaders of both the Party and nation have been caring for the growth of the company. Chairman Mao underlined the documents for the factory establishment. Later, ZhangAiping., one General, and Chen Shiju, one commander, inscribed name for the company. In 2008, Mr. He Guoqiang, Standing Committee of Political Bureau of CPC Central Committee, Secrrtary of the Discipline Inspection Commission of CPC Central Committee had paid a visit to the company and inspected the workshop and saw the erection of the mechanized bridge, who also encouraged the company to develope well.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHINA HARZONE INDUSTRY CORP.,LTD.
Location No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Contact Person Sun Ruyu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.