​​TEMA Class R Exchanger: Carbon Steel Seamless Tubes Bundle, 1.5×Hydrotest per ASME Sec VIII

Price Negotiable
Price: 0-1000000USD
MOQ: 1 SET
Delivery Time: 30-60DAYS
Brand: YUHONG
Product Description

​​TEMA Class R Exchanger: Carbon Steel Seamless Tubes Bundle, 1.5×Hydrotest per ASME Sec VIII

 

TEMA Class R Carbon Steel Heat Exchanger meets stringent ASME Section VIII and TEMA standards which ensures safety, reliability, and long-term performance in demanding industrial environments.

 

1. Advantages of Carbon Steel Tube Bundles

Feature Benefits
Cost-Effective Reducing project costs.
High Mechanical Strength Suitable for high-pressure applications.
Thermal Conductivity Efficient heat transfer properties.
Weldability Easier to fabricate and repair.
Corrosion Resistance (with HIC) Resist degradation in wet H₂S environments.
Versatility In oil & gas, petrochemical, and power generation.

2. ITP (Inspection and Test Plan) for Carbon Steel Tube Bundles

Step No. Stage Acceptance Criteria Witness/Review
1 Raw Material Inspection ASTM or ASME standards QC, Third-Party Inspector
2 Tube Dimensional Check Per design drawings and tolerances QC
3 Tube Sheet Inspection As per ASME Sec VIII requirements QC
4 Tube-to-Tube Sheet Welding ASME Sec IX standards Third-Party Inspector
5 Baffle and Support Assembly TEMA Class R specifications QC
6 Hydrostatic Testing No leakage or pressure drop Authorized Inspector, Client
7 Final Inspection TEMA standards Client, Third-Party Inspector
8 Documentation Approval Complete and accurate documentation Client, QC

3. Hydrostatic Testing Requirements and Procedure

Key Requirements:

  • Test Standard: ASME Section VIII Division 1.
  • Pressure: 1.5× design working pressure.
  • Hold Time: 2 hours usually we do.

Testing Procedure:

  1. Preparation:

    • Assemble the tube bundle and ensure all openings are sealed with appropriate caps or plugs.
  2. Pressurization:

    • Using a calibrated hydraulic pump, gradually increase pressure to the required test level (1.5× design pressure).
  3. Hold Period:

    • Inspect all welds, connections, and surfaces for visible leaks or deformation 
  4. De-pressurization:

    • Slowly release the pressure after the test duration to avoid damage to the tube bundle.
  5. Post-Test Inspection:

    • Record test results and prepare a detailed hydrotest report for client approval 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Yuhong Group Co.,Ltd
Location 20TH FLOOR,NO.1 NEW WORLD BUILDING ,NO.1018 MINAN ROAD,YINZHOU DISTRICT, NINGBO CITY, ZHEJIANG PROVINCE, CHINA
Contact Person Jikin Cai

Request A Quote

Please check your email address.
Your message must be at least 20 characters.