Mobile Container Coffe Bar , Mobile Hotel Materials Worker Offic Dorm Room

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: 10-15 work days
Brand: CIVL
Product Description

Mobile container coffe bar, mobile hotel materials worker office,dorm room with homelife equipments

Baisc specs:

Structure Steel column Galvanized bending steel,160mm*160mm*2450mm t=2.0mm
Roof girder Galvanized square tube120x60x1.5/30x30x1.5
Roof secondary beam Galvanized rectangular tube,40mm*60mm t=1.5mm
Ground girder Galvanized extruded steel,5955mm*3000mm*148mm Galvanized square tube120x60x1.2/30x30x1.2
Ground secondary beam Galvanized rectangular tube,40mm*60mm t=1.5mm
Ground secondary beam Galvanized rectangular tube,80mm*80mm t=1.5mm
Surface treatment Environmental protection water-based paint, primer + topcoat≥80μm;Color no.:RAL9018
floor Substrate + moisture-proof film Fire retardant fiberboard, density ≥1.2g / m³, flame retardant class B t = 15mm
Wall Color coated board material Double-sided aluminum-plated zinc color coated board, PE coating t=0.3mm
Insulation Flame retardant glass wool, bulk density ≥40kg / m³, flame retardant A grade, t = 50mm
Door Specification WxH=950mm*1960mm
Window Specification WxH=960mm*1000mm with Screen
Frame material Upvc window frame sliding series
Glass Normal Glass
Electricity Voltage 220V~250V,50Hz,3-stage,32A
Line Three-core cable = 4㎡, socket cable = 2.5㎡, lighting switch cable = 1.5㎡
breaker High breaking small circuit breaker with leakage switch
Light Two sets of single tube LED ceiling lights
Switch, socket 1 10A switch, 3 10A five-hole sockets, 1 16A three-hole air conditioning socket

 

Picutres of finished building:

 

 

More pictures of factory:

 

Manufacturing Technology

*** Material : full-color steel sandwich panel/75-100mm glass fiber sandwich panel,

***Q235 strip steel frame structure

***galvanized and anti-rust, anti-corrosion,

***18mm thickness cement particle board .

Advantage:

  •  Fast installation 
  •  Economical
  •  Less geographical restrictions
  •  Safe and stable
  •  Green and environmentally friendly
  • Questions and answer:
  • Q1: Delivery time?

     

    Q2: Production ability?

     

    Q3: How to install?

     

    Answer: Within 15-30 days,According to your quantity and color.

     

    Answer: 200,000units/month.

     

    Answer: With install instruction and video,

    QTY≧1000m2 technicians will be sent off if it is requested(visa fee,air tickets,accommodation, beared by buyers).

     

  • Prefab shipping container,Cargo container,Building prefab,Shipping container home, Modular flat pack container office,Tiny house modular homes, Mobile homes,Trailers, Container house,Container home, movable house, movable toilet,mobile toilet,mobile bathroom,board room,board house,box room,box home,tow box,tow house,tow home,Modern-box-home,Box type house,Contemporary family box house,Container house luxury,Container coffee shop,Container restaurant,Container s, Container hotel,Luxury modern container design s, prefabricated modular houses,

    cheap mobile container homes prefab luxury container house apartment,

    Luxury 40ft Home Shipping Container House Villa Container , 40 ft HC

    Prefabricated portable toilet container s,

    Prefabricated shopping mall, prefabricated container house price prefab modern modular container houses/homes/hotels,

    Extended Folded Prefab Container Homes,

    folding prefabricated house

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company SINO VEHICLE & EQUIPMENT COMPANY LTD
Location No.2999 Qi Zhou Road ,Jinan ,China.
Contact Person DORIN YANG

Request A Quote

Please check your email address.
Your message must be at least 20 characters.