NingBo Die-Casting Man Technology Co.,ltd.
                                                                                                           
Verified Supplier
35 Years
Since 1991
Menu

High Power IP66 150w Led Ufo High Bay AC90-305V Input Voltage

Price Negotiable
MOQ: 10PCS
Delivery Time: 15 WORK DAYS
Brand: DIE-CASTING MAN
Product Description

 
100W  150W   200W   250W   300W Road Outdoor LED Highbay Light Housing IP66 Aluminum Die-Casting NINGBO

 

Material: ADC 3 Aluminum Wattage: 100~300W
IP: 66 CRI: ≥70
Color Temperature: 3000/4000/6500K Input Voltage: AC90 - 265V
Frequency Range: 50 - 60Hz Working Ambient Temperature: -40℃ - 50℃
Working Ambient Humidity: 20% - 90%RH LED Lifetime: 5000h

 
 
YAHB-05  LED HIGHBAY LIGHT LAMP SPECIAL OFFER 100W 150W 200W 250W 300W IP66

Part Number: YAHB-05
Production Lead Time: 7-30 Days
MOQ: 10 PCS
Shipping: EXW / FOB NINGBO
Finish Color: Double gray;Sandy black;

 
 
 
 
 
 
 
Specifications

 

Model Number YAHB-05
Electrical Specifications Frequency Range 50/60Hz
Input Wattage 100~300W
Input Voltage AC90-305V
Operating Humidity 20%~90%RH
Working Temperature -40 ~ 50°C
Power Fact(PF) >0.95
Driver Efficiency > 0.9
Photometric Specifications LED Luminous Flux  
Power Factor PF≥0.92
Led Luminous Efficiency >145LM/W
CRI Ra ≥ 70
Color Temperature 3000/4000/6500k
Mechanical Specifications IP Rating IP66
Warranty 3Years
Heat Radiator die-casting body as heat sink
Lens Patented anti-glare optic lense
Fixture Dimension  
Fixture Weightx  

 
Packing Information

Packing Type 1 unit /ctn
Packing Dimension  
Packing Weight
 

 
YAHB-05-100

YAHB-05-150

YAHB-05-200


 
Q1. What is your terms of payment?
A:Usually,we accept T/T,irrevocable L/C at sight.For regular orders,we prefer 30% in advance,70% against the of B/L.For long term business relations, we have more advantage terms for payment.
 
Q2. What is your terms of delivery?
A: We accept FOB,CIF,etc. You can choose the one which is the most convenient or cost effective for you.
 
Q3: What is the lead time?
A:It usually takes 25 to 35 days after sample confirmation and receiving your advance payment. The specific delivery time depends on the items and the quantity of your order. If the item was non standard, we have to consider extra 10-15days for tooling/mould made.
 
Q4: How about tooling Charge?
A: Tooling charge only charge once when first order, all future orders would not charge again even tooling repair or under maintance.
 
Q5. What is your sample policy?
A: We are glad to send wholesale led street lights samples for your inspection.Standard samples can be free, but the clients need to cover the freight cost.
 
Q6. Can you produce according to the samples or drawings?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
 
Q7: How to confirm the quality with us before starting to produce?
1) We can provide wholesale led street lights samples and you can choose one or more, and then we make the quality according to that. 2) Send us your samples, and we will make it according to your quality.
 
Q8: How to solve the quality problems after sales?
A: Take photos of the problems and send to us. We will make a satisfied solution for you within three days after we confirm the problems.
 
Q9. What is your terms of packing?
A: Generally, we pack our goods in neutral cartons. If you have legally registered patent, we can pack the goods by your logo after getting your authorization letters.
 
Q10. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery. We have QC team comply with TQM,each step is in compliance tothe standards.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company NingBo Die-Casting Man Technology Co.,ltd.
Location No.225, Tanshu Rd, Ninghai, Ningbo, Zhejiang, China
Contact Person Jenny

Request A Quote

Please check your email address.
Your message must be at least 20 characters.