ASTM A213 T91 Seamless Cold Drawn Rolled Alloy Steel Pipe 51*7MM For High Temperature Bolier
ASTM A213 T91 Seamless Cold Drawn Rolled Alloy Steel Pipe 51*7MM For High Temperature Bolier
|
Product Name
|
Alloy steel pipe
|
|
Outside diameter
|
8 mm - 100 mm,or according to customer needs
|
|
Thickness
|
2mm - 15 mm,or according to customer needs
|
|
Unit Length
|
3 m - 13.5 m,or according to customer needs
|
|
Standard
|
ASTM ,GB ,DIN, etc.
|
|
Material
|
A53,ST33,A283,A135,ST37,A53,A106,ST35,A179,A214,A192.A226,A315,ST42,A106-B,etc.
|
|
Trade terms
|
FOB/CIF/CFR,etc.
|
|
Payment terms
|
T/T, L/C,etc.
|
|
Delivery port
|
Tianjin China,or according to customer needs
|
|
Delivery time
|
10-15days or according to the real quantity of the tubes
|
|
Surface
|
Bare surface,varnish painting,galvanizing,other painting as per customers request
|
|
Package
|
In bundles with steel strip or in loose, non-woven fabrics packings or as per customers request
|
|
Application
|
Oil and gas industry; Chemical industry; Power industry; Shipbuilding; Aerospace industry; Machinery Manufacturing; Automotive industry; Mining industry;
|
|
Standard
|
Common Grade
|
Usage
|
|
ASTM A213
|
T5,T9, T11, T12, T222,T91
|
High-temperature service
|
|
ASTM A335
|
P1, P5, P9,P11, P22,P91
|
High-temperature service
|
|
ASTM A519
|
4130,4140, 4145
|
Mechanical tubing
|
|
EN 10216-2
|
16Mo3, 10CrMo5-5,10CrMo9-10,X10CrMoVNb9-1
|
High-temperature service
|
|
DIN 17175
|
15Mo3,10CrMo9-10,13CrMo4-4
|
High-temperature service
|
|
GB/T 5310
|
12Cr2MoG, 15CrMoG,10Cr9Mo1VNbN
|
High-temperature service
|
|
JIS G 3441
|
STPT370, STPT410
|
Machinery, automobiles, and other machine parts
|
|
JIS G 3458
|
STPA12, STPA20, STPA22, STPA23, STPA24, STPA25, STPA26
|
Piping at elevated temperatures
|
|
JIS G 3460
|
STPL450, STPL690
|
Low-Temperature Service
|
|
ASTM A335 Alloy pipe & tube Chemical Composition
|
||||||||
|
Grade
|
UNS
|
C≤
|
Mn
|
P≤
|
S≤
|
Si≤
|
Cr
|
Mo
|
|
P5
|
K41545
|
0.15
|
0.30-0.60
|
0.025
|
0.025
|
0.5
|
4.00-6.00
|
0.44-0.65
|
|
P9
|
S50400
|
0.15
|
0.30-0.60
|
0.025
|
0.025
|
0.50-1.00
|
8-10.00
|
0.44-0.65
|
|
P11
|
K11597
|
0.05-0.15
|
0.30-0.61
|
0.025
|
0.025
|
0.50-1.00
|
1.00-1.50
|
0.44-0.65
|
|
P12
|
K11562
|
0.05-0.15
|
0.30-0.60
|
0.025
|
0.025
|
0.5
|
0.80-1.25
|
0.44-0.65
|
|
P22
|
K21590
|
0.05-0.15
|
0.30-0.60
|
0.025
|
0.025
|
0.5
|
1.90-2.60
|
0.87-1.13
|
|
P91
|
K91560
|
0.08-0.12
|
0.30-0.60
|
0.02
|
0.01
|
0.20-0.50
|
8.00-9.50
|
0.85-1.05
|
|
P92
|
K92460
|
0.07-0.13
|
0.30-0.60
|
0.02
|
0.01
|
0.5
|
8.50-9.50
|
0.30-0.60
|
|
ASTM A335 Alloy Pipe & Tube Mechanical Properties
|
||||
|
Mechanical properties
|
Tensile, min, ksi[MPa]
|
Yield,min, ksi[MPa]
|
Elongation, %(min)
|
Hardness, HB(max)
|
|
P5
|
60[415]
|
30[205]
|
30
|
-
|
|
P9
|
60[415]
|
30[205]
|
30
|
-
|
|
P11
|
60[415]
|
30[205]
|
30
|
-
|
|
P12
|
60[415]
|
32[220]
|
30
|
-
|
|
P22
|
60[415]
|
30[205]
|
30
|
-
|
|
P91
|
85[585]
|
60[415]
|
20
|
250
|
|
P92
|
90[620]
|
64[440]
|
20
|
250
|
Low-alloy steel pipe: Low-alloy steel pipes have an alloy element content of less than 2 %. Characterized by lower cost, it is suitable for some common mechanical and structural purposes that do not require high strength and corrosion resistance.
There is a wide range of alloy steel tubes, according to different combinations of alloying elements, which can produce different performance characteristics to adapt to different needs of use. Here are some common types of alloy steel tubes.
2.Chromium alloy steel pipe;
3.Manganese alloy steel pipe;
4.Nickel alloy steel pipe;
5.Titanium alloy steel pipe;
6.Chromium-molybdenum alloy steel pipe;
7.Carbon-manganese alloy steel pipe;
Classification Based on Manufacturing Process
1.Seamless alloy steel pipe;
2.Welded alloy steel pipe.
1.What is your paying terms?
Our usual paying terms are 30%TT as deposit and balance paid after seeing copy of bill of loading. For clients cooperated for more than one year, we accept 20% prepay. Beside we do business also under D/P and LC terms.
2.How long is your delivery time?
For the goods we have in stocks, we deliver the goods within 5days. If it is a production order with volume not above 200tons, the delivery time will usually be within 25days after sealing contract. And the delivery time shall be slightly longer for order volume above 200tons.
3.Before cooperation we want a sample for inspecting of quality, is that okay?
We can provide a free sample for you shall sample value not above 30 USD, you only need to pay the express charge. For a sample valued more than 30USD, the express charge and just one half of sample value is on the account of you, and we afford the other half.
4.Does your company accept third party inspection?
The answer is yes. Especially for new client, they have concern on product quality and quantity, so they authorized the third party inspection like SGS and BV several times to inspect the goods in stead of them, and we coordinated with their work well.
5.Do you accept annual supply order?
Some of our clients purchase annually. They may place order at beginning or certain time of year, however they need us to supply the goods every month or every season. We can do and accept this kind of supplying. We do not ask for the storage charge, however some percentage of deposit will be with us.
6.What documents do you supply for each order?
The documents will usually consist of Original Packing List, Commercial Invoice, Mill Test Certificate, Certificate of Origin, Insurance Policy, and Bill of Loading. Some other documents will be as per client request.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.


