Tools & Hardware Pipe Fittings

Stainless Steel 304 / 316 Factory Seamless Butt Weld Reducer Pipe Fitting For Industry

Price Negotiable
Price: negotiable
MOQ: 0.5-1 tons
Delivery Time: 15days->
Brand: TOBO/TPCO/TISCO/VALIN/METAL
Product Description

Stainless steel 304/316 factory seamless but-weld reducer pipe fitting for Industry

 
 
Product introduction
1.Low Density and High Strength
2.Excellent Corrosion Resistance
3.Good resistance to high temperature
4.Excellent Bearing to cryogenic property
5.Good thermal properties
6.Low Modulus of Elasticity
7.Toughness, light weight
8.High property of acid and alkali resistance
Specification
Material

GR2,GR7,GR12,BT1-00,BT1-0,BT1-2

N200,N6,Inconel600,Monel400, Hastelloy-C276

standard ASTM B363, ASME B16.9, HG20592
Type and size Concentric, eccentric,NPS 1/4" - 24"(DN15-1200)
Wall thickness Sch10s,20,30,40s etc
Technical Pressing,welded, seamless
Inspection for welding lines X-Ray Tests or Dye Penetrate Tests
Press Test Hydrostatic Tests
Material Test Report EN10204.3.1,Chemical Composion And Physical Properties
Product Marking All products are marked by laser after they are finished
Application Petroleum, Chemical Industry, Chloralkali, Metallurgy, Carbonization, Refrigeration, Light Industry, Salt Industry, Electric Power,etc.
Certifcate ISO9001:2015

 

Essential details
Warranty:
1 year
Customized support:
OEM, ODM
 
Place of Origin:
China
Brand Name:
TOBO
Model Number:
4"*3" 10S 304
Technics:
COLD-FORMED
Connection:
Welding
Shape:
Reducing
Head Code:
round
Keyword:
concentric reducer
Packing:
Wooden Case
Material:
304
Application:
Construction
Size:
4"*3"
MOQ:
10 Pcs
Delivery Time:
15-25 Days
Payment terms:
L/C T/T (30%DEPOSIT)
Surface treatment:
Pickling
Certification:
ISO/PED
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Supply Ability
Supply Ability
5000 Piece/Pieces per Month
Packaging & delivery
Packaging Details
stainless steel sanitary elbow
wooden case,20GP:5.89X2.35X2.38M,40GP:12.03X2.35X2.38M,etc
Port
Shanghai
Picture Example:
Lead time:
Quantity(pieces) 1 - 100 >100
Lead time (days) 15 To be negotiated
 

 

Certifications
Company Profile
Product Testing
Process flow
FAQ
FAQ
 
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the Alibaba certification.

2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to
quantity.

3.Where is your factory located? How can I visit there?
We locate in Daqiuzhuang Town, Jinghai District, Tianjin, China, 30 minutes from Beijing by train.

4. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.

5. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TOBO STEEL GROUP CHINA
Location 2F,Building7,Baolong Center,No.689,Xiwang Road,Jiading District,Shanghai,201800,China
Contact Person Joy Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.