Stainless Steel Sanitary Welded Elbow Mirror Elbow Inside And Outside The Full Throw Welded Double Mirror 90 Degree Elbow
Price:
negotiable
MOQ:
1PCS
Delivery Time:
25workdays
Brand:
TOBO
Product Description
Production and sales of carbon steel, alloy steel and stainless steel materials such as butt welding pipe fittings, socket welding pipe fittings, threaded pipe fittings, non-standard pipe fittings and flanges and other products. Complete inspection and testing technology and advanced testing equipment to ensure that the product from the raw material re-inspection, size and appearance inspection, performance testing, non-destructive testing and other testing to meet the standards and ordering technical requirements. The perfect product manufacturing system management software ensures that the whole process of production and service is under control, and insists on continuous improvement to achieve customer satisfaction.
Process flow
Details Images
Product Paramenters
Notes:
1) Besides these, GB/T 10752 SH 3408 SH 3409 HG/T 21635 HG/ T 21631 SY/T 0510 DL/T 695 EN 10253 etc.are also applied. 2) The elbow with NPS over 80 shall be made subject to the sizes agreed by purchaser and manufacturer.
Recommend Products
Company Profile
Packaging & Shipping
FAQ
Q1: How is the quality? A: Quality is priority. We pay much attention to the quality check. Every product will be fully assembled and carefully tested before it's packed for shipment.
Q2: What is your minimum order quantity? A: The MOQ for each product is different, so it would be recommended to refer to the detail page of the product you are interested in. If you need further clarification, send me the product link, and I will reply as soon as possible.
Q3: Can I customize products? A: Yes. Let me know the specific customization requirements, and I will get back to you as soon as possible.
Q4: Do you provide samples ? Is it free or extra ? A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q5: How long is your production lead time? A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
TOBO STEEL GROUP CHINA
Location
2F,Building7,Baolong Center,No.689,Xiwang Road,Jiading District,Shanghai,201800,China
Contact Person
Joy Wang
















