Metal Stainless Steel 304/316 Pipe With High Quality

Price Negotiable
Price: negotiable
MOQ: 1PC
Delivery Time: 7-15workdays
Brand: Metal
Product Description

Product descriptions from the supplier

 
 
 
 
Specification
item
value
Tolerance
±10%
Grade
300 Series
Steel Grade
304N
Surface Finish
TSHS
Invoicing
by theoretical weight
Standard
DIN
Place of Origin
China
Section Shape
ROUND
 
12mm
Alloy Or Not
Non-Alloy
Delivery Time
22-30 days
Product Description
Company Profile
Product Testing
Process flow
Certifications
Our Advantages
If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.
If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term
cooperated agent also available.
FAQ
FAQ

Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.

Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10
days, average production time after sample approval is 2-3 weeks.

Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.

Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2500 tons rubber materials per month.

 
Company Profile
Product Testing
Process flow
Certifications
Our Advantages
If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.
If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term
cooperated agent also available.
FAQ
FAQ

Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.

Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10
days, average production time after sample approval is 2-3 weeks.

Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.

Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2500 tons rubber materials per month.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TOBO STEEL GROUP CHINA
Location 2F,Building7,Baolong Center,No.689,Xiwang Road,Jiading District,Shanghai,201800,China
Contact Person Joy Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.