Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty
Solar Strut Roll Forming Machine
Technical Parameter
1. Suitable Plate Material: thickness 1.5-3mm, Galvanized steel or blank steel
2. Working Speed: 12-15 meters / min
3. Forming Steps: 19 stations
4. Material of Roller: Gcr15, Quench HRC58-62 Plated Chrome
5. Material of Shaft: 45# Advanced Steel (Diameter: 76mm), thermal refining
6. Main Power with reducer: 22KW WH Chinese Famous
7. Cutting: Hydraulic Cutting Cr12mov
8. Material of Cutting Knife: Cr12Mov, Quench HRC58-62
9. The whole machine is controlled by industry computer-PLC.
10. PLC--Panasonic, Japan English and Chinese Language
11. Touch Screen--Panasonic Japan
12. Encoder--Omron, Japan
13.Electric parts--Schneider
14.Cutting holder: fly saw cutting
Main Structure and Characters
|
Commodity & Description |
Quantity |
|
5T manual uncoiler |
1 set |
|
Leveing guiding |
1 set |
|
Servo feeding device |
1 set |
|
Main roll forming machine |
1 set |
|
Punching Device |
1 set |
|
Cutting device |
1 set |
|
Finished products tabel |
1 set |
|
PLC control system |
1sets |
|
Out tables |
1 sets |
|
Spare parts |
1 sets |
Working Flow of Roll Forming Machine
Uncoiling-Feeding&Leveling-Punching--Roll forming-Cutting-Products collecting
A.Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)
B.Servo Feeding Applicator............................................To feed the material accurately
C.Hydraulic/Press Punching...........................................To punch as requirements
D.Roll Forming Unit.........................................................To roll form as requirements
E.Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)
F.Output Table................................................................Support the finished products
Standard profile of product
Machine Photo


- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.


