Hydraulic Automatic Cutting To Length Machine For 0.5-1.5mm Galvanized Steel
Hydraulic Automatic Cutting To Length Machine For 0.5-1.5mm Galvanized Steel
Technical Data
- Material of processible coiled plate: Galvanized steel, Carbon steel and others G550MPA
- Thickness of coiled plate: 0.5-1.5mm;
- Width of coiled plate: 1500mm;
- line speed: 0-30m/min ;
- Loading capacity:5T;
- Coil I.D: ф480-510mm;
- Coil O.D: ≤ф1400mm;
- diameter of leveling rollers: ф60
- the distance between leveling rollers: 65mm
- material of leveling rollers:42CrMo, hardness:HRC52-60
- Power: 220V three-phase electricity 60Hz;
- tolerance of diagonal error:≤±2mm/2000mm
- tolerance of length error: ≤±2mm/2000mm
Machine lists
| 5 ton Mechanical Electrical De-coiler | 1 set |
| Leveler machine | 1 set |
| Cutting machine | 1 unit |
| Receivable table | 1 unit |
| hydraulic station | 1 unit |
| PLC controlling system | 1 unit |
Details of Each Composition
- Mechanical electrical de-coiler
Structure: four connection rods adjust manually and mechanically and the motor drives the steel coils doing uncoiling. Specification: 508×1250(width of roller)
- Leveler
◆It is composed of 17 working roller, driving device, 2 pinch code rollers and machine frame.
◆the function of supporting roller: make the even rollers receive the balanced force and reduce the friction of the leveling rollers
◆Drive model: all the independent rollers and gear box are driven by 30kw frequency conversion
- 1x1500 cutting machine
◆shear model: cut from up to down hydraulically.
◆Cooperate with the signal direct from the feeder
and shear automatically
◆Adopt gap adjusting design to cut the materials and can shear 1mm steel plate safely .
- Receible table
◆It is welded by steel(6m)
- Hydraulic Control System
◆Ensure the using of hydraulic parts
◆The working pressure of the hydraulic system is 6.3-16Mpa
◆Hydraulic tank capacity is 100 liters
- Electrical control system
PLC control mode, It is controlled by LCD screen.
IV. The foundation engineering of the equipment
◆The seller will provide the buyer the foundation plan of the equipment in 30 days after signing contract.
◆The construction and monitoring of all the foundation engineering of the equipment are in the control of the buyer.
◆The foundation holes are reserved holes, to match the foot holes of equipment.
◆After the equipment has been installed, the buyer is responsible for the foundation hole irrigation mud.
Machine photos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.


