1.4301 / TP304 Size 3 / 8 Inch Stainless Steel Tubing For Transportation
1.4301 / TP304 Size 3 / 8 Inch Stainless Steel Seamless Tubing For Transportation
ASTM A213 / A213M Standard Chemical Composition :
| Elements | 304L(wt%) S30403 | 304(wt%) S30400 | 316L (wt%) S31603 | 316 (wt%) S31600 |
| (C) Carbon, max | 0.035 | 0.08 | 0.035 | 0.08 |
| (Mn) Manganese, max | 2 | 2 | 2 | 2 |
| (P) Phosphorus, max | 0.045 | 0.045 | 0.045 | 0.045 |
| (S) Sulfur, max | 0.03 | 0.03 | 0.03 | 0.03 |
| (Si) Silicon, max | 1 | 1 | 1 | 1 |
| (Ni) Nickel | 8.0 - 12.0 | 8.0 - 11.0 | 10.0 - 14.0 | 10.0 - 14.0 |
| (Cr) Chromium | 18.0 - 20.0 | 18.0 - 20.0 | 16.0 - 18.0 | 16.0 - 18.0 |
| (Mo) Molybdenum | N/A | N/A | 2.0 - 3.0 | 2.0 - 3.0 |
| (Fe) Iron | Bal. | Bal. | Bal. | Bal. |
| (Cu) Copper | N/A | N/A | N/A | N/A |
| (N) Nitrogen | N/A | N/A | N/A | N/A |
Chemical Composition
| C(max) | Si(max) | Mn(max) | P(max) | S(max) | Cr | Ni | Mo | Ti | |
| TP304/1.4301 | 0.080 | 1.00 | 2.00 | 0.045 | 0.030 | 18.0-20.0 | 8.0-10.5 | ||
| TP304L/1.4307 | 0.035 | 1.00 | 2.00 | 0.045 | 0.030 | 18.0-20.0 | 8.0-12.0 | ||
| TP304H/1.4948 | 0.04-0.10 | 1.00 | 2.00 | 0.045 | 0.030 | 18.0-20.0 | 8.0-12.0 | ||
| TP316/1.4401 | 0.080 | 1.00 | 2.00 | 0.045 | 0.030 | 16.0-18.0 | 11.0-14.0 | 2.0-3.0 | |
| TP316L/1.4404 | 0.035 | 1.00 | 2.00 | 0.045 | 0.030 | 16.0-18.0 | 10.0-14.0 | 2.0-3.0 | |
| TP316Ti/1.4571 | 0.080 | 1.00 | 2.00 | 0.045 | 0.030 | 16.0-18.0 | 10.0-14.0 | 2.0-3.0 | 0.7>5x(C+N) |
| TP321/1.4541 | 0.080 | 1.00 | 2.00 | 0.045 | 0.030 | 17.0-19.0 | 9.0-12.0 | 0.7>5x(C+N) | |
| TP317L/1.4449 | 0.080 | 1.00 | 2.00 | 0.045 | 0.030 | 18.0-20.0 | 11.0-14.0 | 3.0-4.0 | |
| TP347H/1.4912 | 0.04-0.10 | 1.00 | 2.00 | 0.045 | 0.030 | 17.0-19.0 | 9.0-13.0 | ||
| TP309S/1.4833 | 0.080 | 1.00 | 2.00 | 0.045 | 0.030 | 22.0-24.0 | 12.0-15.0 | 0.75 | |
| TP310S/1.4845 | 0.080 | 1.00 | 2.00 | 0.045 | 0.030 | 24.0-26.0 | 19.0-22.0 | 0.75 |
Application
a) For fluid & gas transport
b) Structure & machining
c) Petrochemical
d) Environmental protection
e) Electricity
f) Instrument industry etc
Advantages
a) Superior surface finish
b) Better mechanical property
c) More precise dimension
d) Perfect inspection method and inspection equipment
Price Item FOB , CFR , CIF or as negotiation
Payment TT, LC or as negotiation
Delivery Time 30 working days after received your deposit ( Normally according to the order quantity )
Package Iron case ; woven bag or as per customer’s requirement
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.