HD-0813 Cement Bag Bottom Gluing Pasting Machine High Speed
Price:
US 520000 Set
MOQ:
1 Set
Delivery Time:
100 days
Brand:
PRINTYOUNG
Product Description

HD-0813 Bottom Pasting Machine

Technical Parameters
|
HD-0813 Bottom Pasting Machine
|
|
|---|---|
|
Suitable Base Material
|
2~4 Layers of Kraft Tube or Clupak Tube
|
|
Tube Length
|
Step bag tube length is 570~1040mm
Straight cut bag tube length is 660~1020mm
|
|
Tube Width
|
420--620mm
|
|
Bottom-pasting Width
|
90--160mm
|
|
Valve Sheet
|
(Length×Width) (150-250) × (120- 170) Adjustable
|
|
Bag Length
|
450~920mm
|
|
Bottom Center Distance
|
360~730mm
|
|
Bottom-Open Width
|
210~380mm
|
|
Max Bottom-pasting Speed
|
Max 150pcs/m, Production Speed: 100~140 pcs/m
|
|
Installed Capacity
|
25KW
|
|
Overall Dimensions
|
( L* W*H) 22*1.8*1.8 (M)
|
|
Total Weight
|
20 ton
|
|
Work Environment
|
Under the situation of humid,overdry weather or
when voltage fluctuates over 5%, handle it carefully
|
Configuration
Auto Bag-Up Instrument
1.Sacks are inhaled by vacuum sucker and output separately.
2.The sun wheel sucks 8 sacks each turn.
3.Tube length depends on feeding speed.
2.The sun wheel sucks 8 sacks each turn.
3.Tube length depends on feeding speed.
Permutation Instrument
Sack tubes sequence by size,and automatically keep them in alignment,especially the edges.
Puncturing and Trace Pressing Instrument
1.Puncture tubes air bleeders near the filling mouth.
2.Auxiliary technique for bottom-opening,to make bottom-opening conform certain regulation or standard.
2.Auxiliary technique for bottom-opening,to make bottom-opening conform certain regulation or standard.
Vacuum Sucking
1.Vacuum sucker opens the two bottoms to a certain height.
2.The cavel opens the two bottoms rapidly.
3.Press the bottoms to the back wallboard,open the back tube corner,and blow to compress the back corner.
2.The cavel opens the two bottoms rapidly.
3.Press the bottoms to the back wallboard,open the back tube corner,and blow to compress the back corner.
4.Press and flatten the sack bottom.
Test Instrument
Check if the two bottoms are open to get ready for the next process.
Valve Sheet Glue-Rubbing Unit
Rub glue automatically before sticking valve sheet and adjust the glue volumn by adjusting the gap between the glue box and glue-rubbing roller.
Valve Sheet Feeding Instrument
1.Length of valve sheets
2.Positiong of the cutter
3.Position of sheet clamping
4.Relative position between Sack tube and valve sheet
2.Positiong of the cutter
3.Position of sheet clamping
4.Relative position between Sack tube and valve sheet
Presing Trace Horizontally to Two Bottoms
1.Prepressing trace before folding bottoms.
2.Adjustable bottom folding widths.
2.Adjustable bottom folding widths.
Botomm Glue-Adding Unit
1.Rub glue according to certain shape and size to two bottoms.
2.Glueamount can be adjusted by glue volume
3.Adjust glue-rubbing wheel to change paste width
4.Glue can automatically recycled
2.Glueamount can be adjusted by glue volume
3.Adjust glue-rubbing wheel to change paste width
4.Glue can automatically recycled
Bottom Forming Instrument
Forming two Bottoms,Sticking and compressing.
Bag-Output Baling Instrument
Bag-out Permutation Instrument sequences bags and output them in bales of 25pcs each








Q1.Are you a manufacturer or a trading company?
A:Our shanghai office is mainly doing export.We have our own factory in Wenzhou,Zhejiang Province.
Q2.What is the machine warranty?
A:One year.After the warranty,we still provide technical support to buyer at low cost.
Q3.What is the production time while placing order?
A:Normally about 10-20 days.
Q4.What is the delivery time?
A:15-30days after deposit.
Q5.Can your company handle shipping for customers?
A:Yes,just give us destination sea port or container yard.
Q6.Does the packing strong?
A:Yes.Adopts moisture-proof and shock-proof packaging which is suitable for long-distance road transportation and various types of weather conditions.A full set of maintenance and operation manuals is included.
Q7.How about the machine installation and training?
A:1)We provide training in our factory for free;
2)We can send technicians (engineers) to your factory for installation and training.
You shall pay the round trip air fare and accommodations,plus each technician charges USD100/per day.
Q8.Do you have machines in stock?
A:For standard model,we have a large quantity in stock.For special model,we need 20-30 days to produce it for you.
Q9.How can you assure the machines’ quality?
A:Each machine will be test running at least 24 hours before delivery to assure the quality.
And during the warranty,we will give spare parts for free if machine has any problem.
Q10.Do you inspect machines or test running before packing?
A:Of course we do.We have QC department to debug the machine before packing.
If you want to use specific material to do the test running,you need to pay for the cost of the material.
Q11.What’s the payment term?
A:T/T 30% in advance,the balance shall be paid before delivery.We also accept payment by West Union or L/C at sight.
Q12.Do you accept factory visiting?
A:Warmly welcome for your visiting.
Q13.How many years are you in printing field?
A:The Shanghai company since in 2008,the factory is more than 25years.
Q14.How many clients do you have?
A:We have sold our machines to about 60 countries.We have agents in South Africa,Morocco and Italy.
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shanghai Printyoung International Industry Co.,Ltd
Location
Room 27B, NO,58 New Jinqiao Road, Pudong, Shanghai, China 201206
Contact Person
Caren