YUEQING YOMIN ELECTRIC CO., LTD
                                                                                                           
Verified Supplier
24 Years
Since 2002
Menu

Close-Link Three Phase Energy Meter Test Bench with Isolated CT for 24 Positions

Price Negotiable
Price: Negotiation
MOQ: 1 Pieces
Delivery Time: 5-30 working days after receiving payment
Brand: YOMIN
Product Description

Close-Link Three Phase Energy Meters Test Bench with Isolated CT for 24 Positions

 

Description

First steps in the production of fully electronic automatic electricity meter calibration systems were made 10 years ago by KAIPU. The system described and offered here comprises components based on most modern technologies. It therefore combines long term experience in this field with the application of state of the art technology.The recently developed new software is based on KAIPU ’s historical experience in providing various testing solution to numbers of manufacturers, Utility companies, Metrological institutes etc.

 

Technical specification

Power supply: 220V+10%, 50Hz/60Hz
Maximum power consumption: 1000VA (reference for 24 positions)

 

Features

The offered universal meter testing equipment is designed for the simultaneous testing,
adjustment and certification of meters.
The following electricity meters of the accuracy classes 0.2, 0.5, 1 and 2 can be tested:
*2 wire-, 3 wire- and 4 wire meters for active and reactive energy (true and cross-connected),


The test system incorporates a completely electronic test current- and test voltage
generation. The working standard is a wide range substandard meter directly connected to the test circuit.


A PC system controls the test system and supervises the test procedure. The actual
values of test voltage and -current and the errors of the meters under test are displayed on the monitor. The errors of the meters are indicated additionally on error displays at each measuring position.

 

Structure and main parts


①  Error calculator    

② Bracket(socket) for tested meter

③  RS485 Communication Port

④  pulse input

⑤  power switch

⑥  Power on for amplifier

⑦  Power off for amplifier

⑧  signal generator

⑨  three phase reference meter

⑩  voltage output from power source

⑾  current shortcut(In this test bench, when worker use meter position 1 - meter position 8, the             above 3 current shortcut should be closed and the under 2 current shortcut should be open.    

      When worker use meter position 9 - meter position 16, the above 3 current shortcut should be

      open and the under 2 current shortcut should be closed. )

⑿  amplifier (voltage & current)

⒀  range shifter (voltage & current)

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company YUEQING YOMIN ELECTRIC CO., LTD
Location Qiaoqian Industry Area, Liushi Town, Yueqing City, Zhejiang Province, China
Contact Person Linda

Request A Quote

Please check your email address.
Your message must be at least 20 characters.