High-Strength Steel Novec1230 Agent Storage Cylinder with 5.3Mpa/8.0Mpa Working Pressure for UAE Civil Defence Approved Fire Suppression Systems
Price:
Pricing based on quantity
MOQ:
1 set system
Delivery Time:
15-20days
Brand:
Guangzhou Xingjin Fire Equipment Co.,Ltd.
Product Description
Durable Novec1230 Agent Storage Cylinder for Pipe Network Fire Fighting System
Novec1230 (FK-5-1-12) fire suppression agent cylinders are the core pressure vessels of clean agent fire extinguishing systems, designed to safely store Novec1230 extinguishing agent. Manufactured from high-strength steel, these cylinders are available in both 25bar and 42bar working pressure ratings, making them suitable for fire suppression systems protecting data centers, telecom facilities, banks, hospitals, and museums across the UAE.
Why Choose Novec1230 Cylinders - UAE Market Adaptation
The UAE market imposes stringent technical and compliance requirements on fire protection systems. Novec1230 cylinder systems offer the following key advantages:
| Adaptation Aspect | Details |
|---|---|
| International Standards Compliance | Systems comply with NFPA 2001 and ISO 14520, with FM and UL certification options available to meet UAE Civil Defence technical requirements |
| Environmental Compliance | Zero ODP, GWP of 1, and atmospheric lifetime of only 5 days, meeting UAE's stringent environmental regulations |
| Supports 2026 New Regulations | UAE Civil Defence 2026 circulars mandate clean agent fire suppression for IT server rooms, UPS rooms, and electrical switchgear rooms |
| Temperature Range Adaptability | Cylinders can operate at -18°C to 50°C storage temperatures, suitable for UAE climate conditions |
| Local Service Support | UAE has licensed suppliers providing refilling, testing, and maintenance services |
UAE Typical Applications
Novec1230 cylinders, as core components of fire suppression systems, are widely installed in the following UAE commercial and industrial facilities:
| Application | Typical Scenarios |
|---|---|
| Data Centers & Server Rooms | Data centers and enterprise server rooms in Dubai and Abu Dhabi; clean agent systems now mandatory from 2026 |
| Telecommunications Facilities | BTS sites, switching centers, communication hubs |
| Banks & Financial Institutions | Bank data centers, vaults, trading system rooms |
| Healthcare Facilities | Operating theaters, MRI rooms, pharmaceutical cold storage in major hospitals |
| Museums & Archives | Cultural heritage sites including Louvre Abu Dhabi and similar institutions |
| Oil & Gas Facilities | Refinery control rooms, offshore platform control rooms, pump rooms |
| Marine Vessels | Ship engine rooms and cargo holds |
| High-Rise Building Electrical Rooms | UPS rooms and electrical rooms in Dubai's commercial and residential high-rises |
Key Advantages
- High-Strength Steel Construction
Forged from high-quality carbon steel, available in 25bar and 42bar working pressures, with maximum working pressures of 35bar (25bar system) and 60bar (42bar system) - Various Capacity Options
Available in multiple sizes to suit different system designs; common configurations include 52L, 106L, 147L, 180L, etc. - Strict Pressure Ratings
Both 25bar and 42bar filling pressures available to meet diverse UAE project specifications - Safe & Reliable
Each cylinder undergoes rigorous hydrostatic and air-tightness testing, fitted with rupture discs and pressure gauges for long-term storage safety - Strong Compatibility
Compatible with major UAE system integrators and can be integrated with Tyco, Viking, NaFFCO, and other branded systems - Refillable Design
After agent discharge, cylinders can be returned to licensed refilling stations in the UAE. All refilling services must carry DCD-approved test stamps
Technical Specifications
| Parameter | 25bar System | 42bar System |
|---|---|---|
| Filling Pressure (20°C) | 25bar | 42bar |
| Max Working Pressure (50°C) | 35bar | 60bar |
| Rupture Disc Response Pressure | 62bar | 88bar |
| Filling Density Range | 400-1200 kg/m³ | 400-1200 kg/m³ |
| Operating Temperature Range | -18°C to 50°C | -18°C to 50°C |
| Material | Carbon Steel, Red Powder Coated | Carbon Steel, Red Powder Coated |
| Applicable Standards | NFPA 2001, ISO 14520, UL, FM | NFPA 2001, ISO 14520, UL, FM |
UAE Civil Defence Approval Process
Installation of Novec1230 fire suppression systems (including cylinder assemblies) in the UAE must follow this compliance process:
Step 1: Drawing Submission & Approval
- System design drawings submitted by a Civil Defence licensed contractor
- Submitted digitally through the Civil Defence e-services portal
- Approval typically takes 1-3 working days
Step 2: Material Approval
- All cylinders and valves must carry Civil Defence-recognized certifications (UL/FM/ESMA)
- Using uncertified substitutions is a common cause of inspection failure
Step 3: Installation & Pre-Inspection
- Contractor installs according to approved drawings
- System undergoes self-audit with signed Installation Certificate
- Annual Maintenance Contract (AMC) documentation must be submitted prior to final inspection (2026 enforcement update)
Step 4: Civil Defence Inspection & Certification
- Civil Defence engineers conduct site inspection
- Verify installation matches approved drawings and perform system function tests
- Upon passing, Completion Certificate and fire safety NOC are issued
UAE Local Service Support
- System design and drawing preparation in compliance with UAE Civil Defence codes
- Cylinders can be configured to meet ESMA conformity certification and Civil Defence approval requirements
- Assistance in coordinating with UAE licensed contractors and refilling service providers
- Common cylinder sizes and spare parts available in Dubai/Abu Dhabi
- Engineering support available for on-site installation guidance and commissioning in the UAE
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Guangzhou Xingjin Fire Equipment Co.,Ltd.
Location
Room 703&704, N0.3 Building, NO.8 Lianyun Erheng Road, Shiqi Town, Panyu District, Guangzhou, China
Contact Person
Anna