Casting Machine Parts Return Water Tank For Cooling Water
Price:
Negotiable
MOQ:
1set
Delivery Time:
15 DAYS
Brand:
E&V
Product Description
Casting Machine Parts Return Water Tank For Cooling Water
The water cooling system is an independent water recycling system which supplies the cooling water for the crystallizer, the water jacket and the induction coil. It includes one 80M2 water pool, water pump, pipelines and the cooling tower. It insures that the inlet water temperature is around 20-35℃, the flow rate is about 50m3. For a good heat exchanging effect, the user need to prepare the water soften device.
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
JIAXING JICHENG MACHINERY CO.,LTD.
Location
Room1190,No.106 xinling road China(shanghai), pilot free trade zone
Contact Person
Cherry
