JIANGSU HUI XUAN NEW ENERGY EQUIPMENT CO.,LTD
                                                                                                           
Verified Supplier
10 Years
Since 2016
Menu

Hydroelectric Generator Turbine Rotor Forging Heat Treatment Custom 20SiMn

Price Negotiable
Price: Negotiable
MOQ: 1 piece
Delivery Time: 30-60 days
Brand: HUIXUAN
Product Description

 

Hydroelectric Generator Turbine Rotor Forging Heat Treatment Custom 20SiMn 

 

 

Products:

Vertical water turbine main shaft,horizontal water turbine main shaft,water turbine main shaft,water turbine generator main shaft,water turbine operation frame,water turbine thrust disc,magnet yoke

 

 

Products reference:

Material 20SiMn,1045,35SiMn,4140
 Forging equipment 8000T Open die hydropress
Application

 

Hydro electric generator transfer mechanical energy into electrical energy by rotor

Melting process EF+LF+VD
Production process

 

Forging+heat treatment+rough machining+finish treatment

Forging ratio

 

≥3.5

Applicable standard ASTM,ASME,DIN,JIS,ISO,BS,API,EN
Executive standard JB/GB/EN/DIN/JIS/ASME/ASTM/ISO
Certification authority ISO9001:2008,BV,SGS, IST, UL,CTI
Delivery term

 

Rough machining(N+T);finish machining(Q+T)

 

Test equipment

 

Spectrograph,ut device,tensile and compact test machine,metalloscope,outside micrometer,bore dial indicator,hardness test machine

Service Our service included the forging, process, heat treatment, finish machining, package, local logistics, customers clearance and maritime transport. We took the customer’s requirements as the principal thing, and pay attention on the products quality.

 

 

Custom properties

 

 Material elements C Si Mn P S Cr Ni Mo Others
20SiMn 0.16-0.22 0.60-0.80 1.00-1.30 ≤0.035 ≤0.035 ≤0.30 ≤0.30 -- -
1045 0.42-0.50 0.17-0.37 0.50-0.80 ≤0.035 ≤0.035 ≤0.25 ≤0.30 --  
4140 0.38-0.43 0.15-0.35 0.75-1.00 ≤0.035 ≤0.040 0.80-1.10 - 0.15-0.25 --

 

Mechanical property

 

Dia.(mm)

 

TS/Rm(Mpa)

 

YS/Rp0.2(Mpa)

 

EL/A5(%)

 

RA/Z(%)

 

Type Of notch

 

Impact energy

 

HBW

 
20SiMn Ø15 ≥450 ≥255 ≥14 -- U ≥39    
1045 Ø25 ≥600 ≥355 ≥16 ≥40 V ≥39 ≤229HBS  
4140 Ø10 740~1000 450~850 ≥12 ≥25 V ≥40 ≤250HBS
 

Process procedure:

Forging process flow quality control: Raw material steel ingot into warehouse(test the chemical content) → Cutting→ Heating(Furnace temperture test) → Heat treatment after forging(Furnace temperture test) Discharge the furnace(blank inspection)→ Machining→ Inspection(UT,MT,Visal diamention, hardness)→ QT→ Inspection(UT, mechanical properties, hardness, grain size)→ Finish machining→ Inspection (dimension)→ Packing and Marking(steel stamp, mark)→ Storage Shipment

 

Commerce clause

 

Max weight 50T
MOQ 1PC
Delivery time 30-50 days
Package wood pallet,steel frame
Delivery term FOB;CIF;CFR;DDU;
Payment term T/T,LC
 type of shipping

 

By ocean,air

 

Keywords:

Various type water turbine main shaft foring,Water turbine main shaft is the key parts of hydro electric installation,utilize water power to rotate water turbine,by means of connection of water turbine main shaft,magnet yoke,thrust block,other key components as well.transfter water energy into mechanical energy,If connect generator to water turbine,as water turbine rotate it will generate electric power,meanwhile mechanical energy transfer into electrical energy

Excellent mechanical properties;Produce different dimension based on customer’s requirements;

Advanced manufacture equipments and inspection devices;Excellent technical personality;

Control the production procedure strictly;Pay attention on the package protection;Quality full service.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company JIANGSU HUI XUAN NEW ENERGY EQUIPMENT CO.,LTD
Location A 1002,HuaJian Mansion,Zhangjiagang City,JiangSu Province,China
Contact Person Arnold

Request A Quote

Please check your email address.
Your message must be at least 20 characters.