JIANGSU HUI XUAN NEW ENERGY EQUIPMENT CO.,LTD
                                                                                                           
Verified Supplier
10 Years
Since 2016
Menu

4140 42 CrMo4 45 Stainless Steel Forging Blind Hole Oil Cylind Hydraulic Cylinder

Price Negotiable
Price: Negotiable
MOQ: 1 piece
Delivery Time: 30-50 days
Brand: HUIXUAN
Product Description

               ASTM 4340 alloy steel hydraulic cylinder for   petrochemical equipment

 

 

Description:

Hydraulic cylinder is the key parts f petrochemical equipment, pressure vessels and other equipment the common material are 4140, 4340 and 45# steel

It conforms to the standards of JB/T4730, EN 13445-2002 and ASME

Material smelting process: EF + LF + VD

Manufacturing equipment is 60MN hydraulic press

Forging reduction ratio ≥3:1

UT standard is in accordance with the standard of JB/T5000.15-2007

Port of loading: FOB Shanghai port

Delivery time: 45 days

 

Process procedure:

Forging process flow quality control: Raw material steel ingot into warehouse(test the chemical content) → Cutting→ Heating(Furnace temperture test) → Heat treatment after forging(Furnace temperture test) Discharge the furnace(blank inspection)→ Machining→ Inspection(UT,MT,Visal diamention, hardness)→ QT→ Inspection(UT, mechanical properties, hardness, grain size)→ Finish machining→ Inspection (dimension)→ Packing and Marking(steel stamp, mark)→ Storage Shipment

 

Features:

  1. High-precision dimensional tolerance;
  2. Excellent mechanical properties;
  3. Produce different dimension based on customer’s requirements;
  4. Advanced manufacture equipments and inspection devices;
  5. Excellent technical personality;
  6. Control the production procedure strictly;
  7. Pay attention on the package protection;
  8. Quality full service.

Specifications:

Description hydraulic cylinder
material 4340
Material standard ASTM or ASME
Dimension Outer diameter: 1850mm, inner diameter: 1368mm and L: 2448mm
N.W 24.6 tons
Smelting Process: EF+LF+VD
Process Ingot→heat→forging→Heat treatment(Normalizing+tempering)→Inspection→rough machining→UT→2nd Heat treatment→finishing machining→Inspection
UTstandard

EN10228.3:1998

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company JIANGSU HUI XUAN NEW ENERGY EQUIPMENT CO.,LTD
Location A 1002,HuaJian Mansion,Zhangjiagang City,JiangSu Province,China
Contact Person Arnold

Request A Quote

Please check your email address.
Your message must be at least 20 characters.