Shijiazhuang Coal Mining Machinery Co., Ltd.
                                                                                                           
Verified Supplier
87 Years
Since 1939
Menu

Special Backfill Tunnel End Support with function for compact the backfill material in underground coal mine

Price Negotiable
Price: USD4Million
MOQ: 1 set
Delivery Time: 90 days
Brand: SHIMEI
Product Description

 

■ Product Features

● With the development of coal mining technology, the requirements for safety, high yield, and high efficiency in fully mechanized mining faces are increasingly higher. The issue of tunnel end and advance support has become a focus of attention for mining operators. Simultaneously, tunnel end and advance hydraulic supports are also key equipment for achieving automated working faces. The tunnel end and advance hydraulic supports developed by our factory have realized the mechanization of tunnel end and advance support. The project "Research and Design of Tunnel End Hydraulic Support for Backfill Mining Faces" completed for Xingtai Coal Mine was awarded the Third Prize for Scientific and Technological Progress by the China National Coal Association; the project "Research and Application of Tunnel End Hydraulic Support for Top-Coal Caving Mining Faces" completed for Dongpang Mine achieved safe and efficient mining in top-coal caving faces. This project has also passed the technical evaluation organized by the Hebei Province Achievement Transformation Center. Advance supports currently come in various forms such as two-column type and transverse type, meeting the personalized needs of users.

 

Features:

The supports must conform to the patterns of mine pressure manifestation during backfilling operations.

The supports must possess sufficient load-bearing capacity to control roof subsidence.

The supports must exhibit no weak points in their load-bearing structure.

The front and rear spaces of the supports must be independent, enabling parallel operations.

 

Supporting strength: 0.5MPa
Working resistance: 6000 kN
Support height: Minimum height 1.5m Maximum height 3.2m

 

 

■ Technical Parameters

 

Model

 

Parameter

Tunnel End Hydraulic Support Tunnel End Hydraulic Support

ZT9600/15/28D

(Fully Mechanized Mining Face)

ZT9400/30/50D

(Backfill Mining Face)

ZT6400/16/31D

(Top-Coal Caving Mining Face)

ZTC28800/17.5/35D ZCZ32000/23/50D ZCZ19200/20/40D
Support Height (m) 1.5-2.8 3.0-5.0 1.6-3.1 1.75-3.5 2.3-5.0 2.0-4.0
Support Center Distance (m) 1.75 2.31 1.46 2.31 2.1-2.9 2.65
Working Resistance (Pa) 9600 9400 6400 28800 2x4000 19200
Initial Supporting Force (kN) 7848 7752 5232 23280 2x3680 15696
Support Strength (MPa) 0.5 0.57 0.4 0.6 0.8 0.6
Floor Specific Pressure (MPa) 2.5 2.98 1.8 1.4 1.94 1.4
Thrust/Pull Force (KN) 989/663 801/528 663/989 577/364 801/529 801/528
Support Advance Step (mm) 700 800 1920 1700 800 1000
Pump Station Pressure (MPa) 31.5 31.5 31.5 31.5 31.5 31.5

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shijiazhuang Coal Mining Machinery Co., Ltd.
Location 167 Yuxiang Street, Shijiazhuang, Hebei province, China
Contact Person Tom Liu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.