EBZ200T roadheader with 100m drilling rig for underground coal mine tunneling
Price:
USD 857000
MOQ:
1
Delivery Time:
15 days
Brand:
SHIMEI
Product Description
EBZ200T roadheader with 100m drilling rig for underground coal mine tunneling

Cylinders
Becuse working circumstance of the roadheader is very tough, so the cylinder's quality will affact the working of the machine greatly. We select the top quality cylinders.
Report from the user



|
Model
|
|
EBZ200
|
|
Weight
|
t
|
58
|
|
Overall dimension
|
mm
|
10620*2690*1830
|
|
Total power
|
321kW
|
286
|
|
Power station
|
kW
|
110
|
|
Cutting power
|
kW
|
200/110
|
|
Cutter speed
|
rpm
|
46/23
|
|
Boom telesopic length
|
mm
|
650
|
|
Width of apron
|
mm
|
3600
|
|
Max. cutting height
|
mm
|
5270
|
|
Max. cutting width
|
mm
|
6630
|
|
Applicable hardness
|
MPa
|
80
|
|
Travelling speed
|
m/min
|
0-7.5
|
|
Width of track shoes
|
mm
|
650
|
|
Groud pressure
|
MPa
|
0.135
|
|
Loading type
|
|
Independent star wheel
|
|
Voltage
|
V
|
660/1140
|
|
Applied tunnel gradient
|
°
|
±18
|
|
Convert valve for roof bolter
|
|
Optional
|
|
Dimensions of max part
|
mm
|
3130*1400*1600
|
|
Weight of the max. part
|
kg
|
6000
|
|
Hole depth
|
m
|
100
|
|
Hole dia.
|
mm
|
133-94
|
Our new type roadheader with exploration function makes a new record On August 27th, good news came from China Coal Xinji Energy Co., Ltd., which used the new type roadheader with exploration function independently developed by our company to carry out rock tunneling operations, and achieved an average daily progress of 10.2 meters and a maximum monthly 325 meters. The good results have set a new record for the mine.
The EBZ200T combines two functions of advanced detection and roadway excavation, which can effectively avoid geological disasters such as gas outburst and water seepage.
Before the tunneling operation, the geophysical excavation machine carried out advanced detection, detecting the drilling depth to 100 meters, the open dia. Is 133mm and the end dia. Is 94mm, from the opening to the completion of the hole, and the use time was about 12 hours, and its drilling speed, drilling quality and equipment stability were better than The crawler tunnel rig. The most important is it reduced the staggering time and space of the two kinds of equipment, improved the comprehensive tunneling efficiency, and won the praise of the users.
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shijiazhuang Coal Mining Machinery Co., Ltd.
Location
167 Yuxiang Street, Shijiazhuang, Hebei province, China
Contact Person
Tom Liu