Shijiazhuang Coal Mining Machinery Co., Ltd.
                                                                                                           
Verified Supplier
87 Years
Since 1939
Menu

Trailer water well drilling rig Double winches 800m drilling depth wwith drilling pressure gauge

Price Negotiable
Price: Negotiable
MOQ: 1
Delivery Time: Negotiable
Brand: SHIMEI
Product Description

Trailer water well drilling rig Double winches 800m drilling depth wwith drilling pressure gauge

 

SPT series trailer-mounted drilling rig is the rotary table type drilling machine is mounted on the trailer. do drilling 655mm diameter and up to 800 meters depth water well, ventilation hole of tunnel, hydrogeological survey hole, grounting hole, in-situ leaching uranium mining well, shallow coalbed methane hole, and some others applications. All the parts including the diesel power, gear box, reducing box, hoist, rotary table, mud pump and derric are all mounted on the chassis. The main transfer is made by mechanically, some parts are controlled by hydraulic. 

 

This machine is with two power resource, one is the engine of the truch chassis, and another one is the diesel machine mounted on the truck.

 

It is with both the advantages of traditional drilling machine such as low consumption, easy operation, easy maintenance and low fault rate, and that of trailer-mounted drilling machine such as convenient and quick. Compared with the same type drilling machine, the capacity reserve coefficient is increased, security lighting system is equipped, with more drilling capacity. 

 

Robust and service center available in 53 countries.

 

It is mainly used for the drilling of water well, hydrogeological exploration, grouting, the shallow coal seam and other construction holes.

Supply scope:

Mast, mud pump, drilling rig, electric motor, electric control boxes for mud pump and drilling rig, hydraulic power pack for erect the mast, ourttigers for stablize the trailer, remote controller to the overhead trolley, driver's cab, air conditioner for the cab, swivel, sheaves, air compressor for the clutches, forks, joints between the Kelley bar and drilling pipe, Kelly bar, lifter, drilling pressure gauge, the device of pull the drilling pipes, steel wire, drilling collars, etc.

Model SPT-800
Drill depth m 800
Overall dimensions mm 15000×2500×4000
Total weight t 17
Kelly bar mm 108×108×10500
Drilling pipe mm 89×9500
Powercapacity kW 55
Hole dia. of Rotary table mm 655
Rotatry speed of rotary table r/min 33 53 77 106
Master hoist maximum lifting capacity kN 60
Slave hoist maximum lifting capacity kN 60
Lifting speed m/s 1 1.67 3.3
Hydraulic system rated pressure Mpa 16
Model of mud pump TBW-850/5A
Master effective height m 15.7
Rated loading capacity of mast t 50
Power Electric motor

 

1. The derrick(mast) will be erected by a hydraulic cylinder and the machine is supported by hydraulic outriggers, and the hydraulic cylinder will assist to shackle. The power pack (Fig. 9) consists a 5.5KW motor which independently drives a CBY2020 gear pump. The reversing valve is a seven-way reversing valve. In addition to four for hydraulic outriggers, one of the other three is used for the derrick erection cylinder, one for the bracket cylinder and the other for the cat head shackle cylinder. In order to ensure the smoothness of erection of the derrick and prevent the hose from bursting, a balancing valve and an explosion-proof valve are installed in front of the derrick erection cylinder. In order to ensure reliable support of the cylinder, the outrigger cylinder and the bracket cylinder are all equipped with hydraulic locks. After the derrick is erected completely, the hydraulic pump can be shut down. The tank has a volume of about 200 liters. Generally, the No. 46 advanced anti-wear hydraulic oil is used. See the hydraulic system schematic (Figure 1) for details.

2. The main control of the rig is air controlled. The air from the air compressor is used for the mud pump clutch, the winch clutch, the turntable clutch, the hoisting clutch of master and slave winch, over winding preventing valve is equipped to the winch to prevent travelling is too high to hit the overhead trolley. See the schematic diagram of the pneumatic system (Figure 2).

Company's name: Shijiazhuang Coal Mining Machinery Co., Ltd.

Company's address: 167 Yuxiang Street, Shijiazhuang, China.

Contact person: Gina

Tel: +86 311 85538986

Fax: +86 311 85538889

Email: ginazi@163.com

Website: www.coalcutting.com

Whatsapp: +8613191856405

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shijiazhuang Coal Mining Machinery Co., Ltd.
Location 167 Yuxiang Street, Shijiazhuang, Hebei province, China
Contact Person Tom Liu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.