Suzhou orl power engineering co ., ltd
                                                                                                           
Verified Supplier
Years
Since
Menu

High pressure hot water boiler mud drum ASME certification manufacturer

Price Negotiable
Price: Contact me | Get Latest Price
MOQ: 1 Set/Sets 10tons
Delivery Time: 50~100 Days
Brand: ORL Power
Product Description

 

High pressure hot water boiler drum ASME certification manufacturer

 

Boiler Mud Drum 

 

The separated steam is drawn out from the top section of the drum and distributed for process. Further heating of the saturated steam will make superheated steam normally used to drive a steam turbine. Saturated steam is drawn off the top of the drum and re-enters the furnace in through a superheater. The steam and water mixture enters the steam drum through riser tubes, drum internals consisting of demister separate the water droplets from the steam producing dry steam. The saturated water at the bottom of the steam drum flows down through the down comer pipe, normally unheated, to headers and water drum. Its accessories include a safety valve, water-level indicator and level controller. Feed-water of boiler is also fed to the steam drum through a feed pipe extending inside the drum, along the length of the steam drum.

 

 

 

A steam drum is used without or in the company of a mud-drum/feed water drum which is located at a lower level. A boiler with both steam drum and mud/water drum is called a bi-drum boiler and a boiler with only a steam drum is called a mono-drum boiler. The bi-drum boiler construction is normally intended for low pressure-rating boiler while the mono-drum is mostly designed for higher pressure-rating.

On steam locomotives the steam drum is also called a steam dome.

 

 

 

Product parameter

 

Product Name Boiler Steam Drum ( Steam Water Separator )
Applied Area Natural circulation boiler
Drum Shell Plate Material

- Carbon Steel : Q245R, P265GH, SA516-Gr.60/65/70

- Alloy Steel : Q345R, Q375R, 15CrMoR, 12Cr1MoVR, P355GH , DIWA353

Drum Head Material Same as shell
Nozzle Tube Material As per design
Standard China GB, ASME, EN
Manufacturer Grade China A Grade, ABS Certificated, TUV Certificated
Working Temperature Saturation Temperature at rated pressure
Working Pressure 1.6 MPa ~ 22.5 MPa

Shell Plate Thickness

(Drum Wall Thickness)

≤150 mm
Drum Diameter ≤3,200 mm
Drum Length ≤25,000 mm
Welding

- Shell : SMAW, SAW

- Nozzle tube : GTAW (TIG), SMAW

Welding NDT

- Shell longitudinal seam : 100% RT, 100% UT

- Shell circumferential seam : 100% RT, 15% UT

- Nozzle tube angle seam : 100% UT, 100% MT

 

Boiler Parts

 

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

 

 

 

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

 

 

 

 

 

Company Information

 

 

 

Product Description

 

 

 

Boiler Parts

 

  • Boiler Drum
  • Boiler Waterwall Panel
  • Boiler Economizer
  • Boiler Header
  • Boiler Cyclone Separator
  • Boiler Chimney Flue Pipe
  • Boiler Air Preheater
  • Boiler Air Preheater

 

Boiler Parts

 

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

 

 

 

Production Workshop

 

 

 

 

Testing Center

Boiler Product Test

 

Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection

 

 

 

Packaging & Shipping

 

 

 

Certifications

 

 

Company Business

Our products have been wildly used in power plants and large international companies overseas.

Such as USA, Brazil, Porto Rico, Guatemala, Spain, Demark, Norway, Turkey, India, Korea, Australia, Middle East, Southeast Asia etc.

 

 

 

 

We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.

 

 

 

 

Trading Process

 

 

ORL offers prompt response, professional products, and all-around service to our customers. Our experienced sales team and engineers are waiting for your enquiry and ready to provide sincere service. We cordially welcome domestic and overseas friends to visit our company and manufacturing bases, and look forward to building up long-term, mutual cooperative relationship with you.

 

 

 

FAQ

 

 

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

 

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.


 

Contact Information

  • ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China
  • Phone:+86 0512-56770166
  • E-mail: info@orlpower.com
  • Website: www.orlpower.com

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Suzhou orl power engineering co ., ltd
Contact Person Allen Liu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.