Suzhou orl power engineering co ., ltd
                                                                                                           
Verified Supplier
Years
Since
Menu

330 MW Waste Heat Petrochemical Industry Recovery Boiler Water Header TUV

Price Negotiable
Price: Contact me | Get Latest Price
MOQ: 1 Set/Sets 10tons
Delivery Time: 50~100 Days
Brand: ORL Power
Product Description

 
 
330MW Capacity Station Power CFB Boiler / Water Factor Power Boiler Header TUV

 

Descriptions:

 

Boiler headers, or boiler manifolds are designed to simplify piping near the boiler, reduce installation time, labor costs and parts used. Available in various branch options with threaded inlet and outlet connections. For closed loop heating applications only.

Boiler header, also called sub-drum,widely used in power generation, petrochemicals, steel, cement, construction and other industries.

Specification:

1. Steam header body diameter: 6inch ,8inch,10inch,12inch,and so on

2. Branch pipe:1',2',3',4',5',6' and so on.

3. pressure:1.0mpa,1.25mpa,1.6mpa,2.0mpa,2.5mpa

4. material:pressure vessel carbon steel.

Kindly tell us the steam header body size and branch size and branch pipe numbers when you want to order this product. Thank you.

 

Technical Parameter:

 

Body Materials

Carbon Steel(20#,20G,SA192,A-1),Alloy Steel(15CrMoG,12Cr1MoVG,T11,T22)etc.

 

Type header body, end cover, tube joint, hand cole, thermometer socket;seamless steel tube, pressure parts
Advantages advanced welding, safe and reliable operation
Working Pressure Depend on material
Standard China GB, ASME
Dimension Customization
Welding SMAW, SAW,GTAW (TIG)
Manufacturing process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Drilling→Welding→RT, PT→ Inspection →Heat treatment →Hydraulic pressure test→Painting→Packaging
Remarks Customized order is also accepted.


 
 


Contact Information
ADD: No.11,East Renmin Road, Yang she Town,  Zhangjiagang City, Jiangsu, China
Phone:+86 0512-56770166
E-mail: orl@orlpower.com
Website: www.boiler-units.com
 
 
Quick Detail:
Waste Heat Petrochemical Industry Recovery Boiler Header
• Alloy steel, carbon steel or as per customer’s requirements
• Good quality, good service, short delivery time
 
Description:
Waste Heat Petrochemical Industry Recovery Boiler Header can be made of alloy steel, carbon steel or other kind of material as per the customer’s requirements. It conforms to the standard of ASTM, EN, DIN, GB.
The manufacturing equipment is 30~185MN hydraulic press, the forging ratio >3, the technical condition is in accordance with the standard of ASTM, EN, DIN, GB.
 
Hot-rolled steel plate produce
1.Hot-rolled plate, hot-rolled steel plate. Complete raw materials after the formation of smelting steel ingot, through the press forming process of ingot steel rolling heating.
2.Width is larger than 600mm(≥600mm), thickness is 0.35-200mm.

 
 

 

Name&Type Supply Ability: FOB Price
Boiler drum 100Ton/Tons per Month Contact Me Get Latest Price
Boiler header 100Ton/Tons per Month Contact Me Get Latest Price
Boiler waterwall panel 500Ton/Tons per Month Contact Me Get Latest Price
Boiler economizer 500Ton/Tons per Month Contact Me Get Latest Price
Boiler super heater 300Ton/Tons per Month Contact Me Get Latest Price
Boiler air preheater 300Ton/Tons per Month Contact Me Get Latest Price
Other 300Ton/Tons per Month Contact Me Get Latest Price

 
Production Highlights
The critical point to manufacture the end cover of steam trap boiler economizer header is the welding process. We adopt the advanced manufacture process, the complete large sized device and mature technology, especially the welding of the end cover with the boiler part header, we adopt the auto submerged welding, this welding method exists the high manufacture efficiency, good quality, the artistic welding appearance, safe and reliable operation.
 
 
Specification of boiler header
China industrial boiler pressure part header for CFB boiler is consisted of header body ( large diameter seamless steel tube), end cover (enclosure), tube joint, hand hole, thermometer socket and so on. And the welding checking is strictly proceeded in the welding process to guarantee 100% qualified products.
 
 

 
 
 
Boiler Parts
Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

 
 
FAQ

 
1. Why choose us?
We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.
We ensure the deliver time, high quality, and the best after-sale service for you.
2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

 

Contact Information

 

ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China
Phone:+86 0512-56770166
E-mail: info@orlpower.com
Website: www.boiler-units.com

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Suzhou orl power engineering co ., ltd
Contact Person Allen Liu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.