Suzhou orl power engineering co ., ltd
                                                                                                           
Verified Supplier
Years
Since
Menu

130 MW CFB / Water Boiler Petroleum Gas Hot Industry Air Preheater For Boiler

Price Negotiable
Price: Contact me | Get Latest Price
MOQ: 1 Set/Sets 10tons
Delivery Time: 50~100 Days
Brand: ORL Power
Product Description

130 MW CFB / Water Boiler Petroleum Gas Hot Industry Air Preheater For Boiler

 

 

 

Description:

Petroleum gas hot industry heat boiler air preheater can be made of alloy steel, carbon steel or other kind of material as per the customer’s requirements. It conforms to the standard of ASTM, EN, DIN, GB.


The manufacturing equipment is 30~185MN hydraulic press, the forging ratio >3, the technical condition is in accordance with the standard of ASTM, EN, DIN, GB.

 

Hot-rolled steel plate produce

1.Hot-rolled plate, hot-rolled steel plate. Complete raw materials after the formation of smelting steel ingot, through the press forming process of ingot steel rolling heating.

2.Width is larger than 600mm(≥600mm), thickness is 0.35-200mm.

 
Product itroduction:
High quality enamel tube air preheater for CFB boiler is a general term used to describe any device designed to heat air before another process (for example, combustion in a boiler) with the primary objective of increasing the thermal efficiency of the process. They may be used alone or to replace a recuperative heat system or to replace a steam coil.
 
 
The APH is the equipment that uses the boiler tail flue smoke to heat the entering air with its inside tubes .It is used to improve the heat exchange performance of the boiler, and reduce energy consumption.

Specifications

Material Carbon steel or equivalent
Structure vertical
Tubes enameled seam or seamless tubes
Tube OD Customized
Enamel thickness 0.34+/-0.06mm
Size Customzied design
Brand ORL
Remarks Customized order is also accepted.
Manufacturing process Material→Ingot → Hot/Cold-Rolling→ Heat treatment(Normalizing+ tempering) → Inspection→Cutting→Pipe piercing→welding→Sealing test→Painting→Packaging

 

 


 

 Comapny Introduction

Main Products


 
Packaging & Shipping

 


Production Workshop




 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FAQ
1. Why choose us?
We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.
We ensure the deliver time, high quality, and the best after-sale service for you.
2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

 

 

Contact Information
ADD:
11 East Renmin Road, Zhangjiagang City, Jiangsu, China
Phone:+86 0512-56770166
E-mail: info@orlpower.com
Website: www.boiler-units.com

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Suzhou orl power engineering co ., ltd
Contact Person Allen Liu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.