CE 6L Laundry Detergent 90mm Pet Bottle Blow Molding Machine
CE 6L Laundry Detergent Bottles Blow Molding Machine
When it comes to bottling drinks production, 70% energy occurs at the blower.
Lines are expected to continuously produce more with less. Besides maximize thecapacity, it is also important to minimize the using cost.We understand that every grams of pet material you save and every electricity watt you reduces can turn into massive return in the future.This is where our upgrading solution value lies.
Product Details :Bottle blow molding machine HT(II)-12L-Economic type
Technical Specification :
| Max .product Volume | (L) | |
| Station | Double | |
| Dry cycle | (pc/h) | 700*2 |
| Screw diameter | (mm) | 90 |
| Screw L/D diameter | (L/D) | 25 |
| Screw drive power | (kW) | 37 |
| Scew heating power | (kw) | 9.1 |
| NO .of heating zone(Screw) | (zone) | 3 |
| Output of HDPE | (Kg/h) | 130 |
| Hydraulic pump driving power | (KW) | 11 |
| Clamping force | (KN) | 110 |
| Platen distance | (mm) | 240-620 |
| Mold moving stroke | (mm) | 550 |
| Max .Size of Mold | (W*H)(mm) | 530*510 |
| Capacity of Accumulator head | (L) | |
| Max .Die diameter(single-head) | (mm) | 220 |
| Die heating power(single-head) | (KW) | 2.6 |
| No .of heating zone(single-head) | (Zone) | 3 |
| central distance of Bi-head | (mm) | 240,260 |
| Max .Die diameter(Bi-head) | (mm) | 145 |
| No .of heating zone (Bi-head) | (Zone) | 5 |
| Heating power (Bi-head) | (kw) | 2.8 |
| Blowing pressure | (MPa) | 0.6 |
| Air consumption | (M^3/MIN) | 0.8 |
| Cooling water consumption | Mpa | 0.3 |
| Water consumption | (L/MIN) | 60 |
| Size of machine | (L*W*H)(m) | 4.1*2.9*3.1 |
| Weight of machine | (TON) | 10 |
Delivery: 30-45 working days
Port: Shanghai port
Engineers available to service machiney overseas
Product description :
Application : Diary
Food & Beverage bottles
Cosmetic & personal care
Lub-oil containers
Household chemical
Industrial
Product Details :Bottle blow molding machine HT(II)-12L-Economic type
Technical Specification :
| Max .product Volume | (L) | |
| Station | Double | |
| Dry cycle | (pc/h) | 700*2 |
| Screw diameter | (mm) | 90 |
| Screw L/D diameter | (L/D) | 25 |
| Screw drive power | (kW) | 37 |
| Scew heating power | (kw) | 9.1 |
| NO .of heating zone(Screw) | (zone) | 3 |
| Output of HDPE | (Kg/h) | 130 |
| Hydraulic pump driving power | (KW) | 11 |
| Clamping force | (KN) | 110 |
| Platen distance | (mm) | 240-620 |
| Mold moving stroke | (mm) | 550 |
| Max .Size of Mold | (W*H)(mm) | 530*510 |
| Capacity of Accumulator head | (L) | |
| Max .Die diameter(single-head) | (mm) | 220 |
| Die heating power(single-head) | (KW) | 2.6 |
| No .of heating zone(single-head) | (Zone) | 3 |
| central distance of Bi-head | (mm) | 240,260 |
| Max .Die diameter(Bi-head) | (mm) | 145 |
| No .of heating zone (Bi-head) | (Zone) | 5 |
| Heating power (Bi-head) | (kw) | 2.8 |
| Blowing pressure | (MPa) | 0.6 |
| Air consumption | (M^3/MIN) | 0.8 |
| Cooling water consumption | Mpa | 0.3 |
| Water consumption | (L/MIN) | 60 |
| Size of machine | (L*W*H)(m) | 4.1*2.9*3.1 |
| Weight of machine | (TON) | 10 |
A:We are located in Zhangjiagang City which is about 2.5 hours nearby Shanghai Airport.If customer want to visit our factory,we will pick up you at the airport.
Q:What`s the payment method?
A: T/T, L/C,Western Union,etc
Q:How long is the warranty?
A:1 year
Q:How long is the delivery time?
A:Under normal conditions, products are delivered within 45 working days.
Q:How can I know the stauts of my order?
A:We will send you photos and videos of your order at different satge in time and keep you informed of the latest information.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.