SUZHOU SHENHONG IMPORT AND EXPORT CO.,LTD
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

4HP Rated Load Portable Diesel Cable Winch For Transmission Line Laying Projects

Price Negotiable
Price: negotiation
MOQ: 2 sets
Delivery Time: 7 days after payment
Brand: SHENHONG
Product Description

4HP Rated Load Portable Diesel Cable Winch For Transmission Line Laying Projects​

 

 

Introduction

The hoist another name is winch. Vertical lifting transport machinery is an important component of the tie in with the , mast, pulley blocks, and auxiliary equipment, used to enhance the materials, installation of equipment operations, from human or mechanical power-driven drum, winding traction rope to complete the installation work. Vertical, horizontal or inclined simple tractor Lifting heavy objects. Two types of the hoist are manual and electric two kinds. The design of the 3-ton electric hoist motor contions electromotor ,coupling,arrester,retarder,drum,boom sheave ,a system of pulleys set,hook, etc..

 

Application

Powered winches are the construction tools of erecting electric circuits of high pressure electric transmission in the sky and laying electrical cables underground. They can complete the tasks of heavy-lifting and dragging such as erecting the wire. Testified by the experiments and practical uses, they have reasonable structure, small volume, light weight, strong power, nimble operation and convient transporting. Based on so many advantages, this Powered winch is popular with the electric workers.

 

Features

1. Reasonable structure

2. Small volume

3. Light weight

4. Strong power

5. Nimble operation

6. Convenient transporting

 

Operation methods

1. Before turning on the machine, you must turn on the clutch first and put the racker for crosspiece - changing in the zero position.

2. When moving the crosspiece, you should be quick. Otherwise the brake won’t work well. When turning on the machine, you shouldn’t work too fiercely.

3. When changing the crosspiece position, you must turn on the clutch. Otherwise the gear will be damaged. After that, you should check whether the changing job is well done. Make sure you haven’t changed two crosspieces in one time.

4. If there is any difficulty during the process of changing crosspiece position, you shouldn’t try to complete the job forcefully. Instead you should use the hand installment to help you complete the job. Concrete procedure: using the spanner to move the hand installment to a position with a certain angle, then you can change the crosspiece position smoothly.

 

Technical Data

Model Type Engine Power Gear Pulling Speed(m/min) Line Pull(Ton)
JJM3-C Diesel Engine Slow 5 3
Quick 12 1.8
Reverse 4.5  

 

Quality Control

We have the complete production equipments and professional production team to manage the whole process from producing to packing and shipping.All of the products will be 100% tested before the delivery to ensure the quality of our products.

 

Our Values

1. Take First-Class Quality as Target and First-class Service.

2. As Responsibility, To Succeed By Scientific Management.

3. Customer in Heart, Quality in Hand, Technology in the Lead.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company SUZHOU SHENHONG IMPORT AND EXPORT CO.,LTD
Location Tanjietang,Xinhe Village,Yetang,Shanghu Town,Chagnshu City,Jiangsu Province,China
Contact Person Judy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.