SUZHOU SHENHONG IMPORT AND EXPORT CO.,LTD
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

Straight Line Cable Pulling Pulley Wheel Aluminum Cable Roller Trench Roller

Price Negotiable
Price: negotiation
MOQ: 1pcs
Delivery Time: 10 days after payment
Brand: SHENHONG
Product Description

 

Straight Line Cable Pulling Pulley Wheel Aluminum Cable Roller Trench Roller

 

Product Description

Power and communication cables are often laid in open trenches where the road and ground conditions result in the cable route having a number of curves. With the cable’s own weight and the high tensions involved the cable cannot be fed cleanly.

We manufacture a lot of models Cable pulling block for different uses in the overhead transmission lineconstruction.They have are used to support conductors, OPGW,ADSS, communication lines.

 

Product features

1. Able to carry high loads
2. With chromel steel ball bearing
3. With a high load-bearing capacity
4. Self-lubrication, precision machined and low friction
5. Low noise, stable performance and durable
6. Able to work in sub-zero temperatures and have low rolling resistance
7. Suitable for countless applications: sliding pipe, machine equipment and other sliding systems

 

Advantage

1) Usage: For delivery of underground cables, used in extended release cable for high- speed single round of linear wheel bearings are not to hurt the cable wheel material steel aluminum cattle dragon can be based on your need to select.

2) The cable pulley can be installed on a different cable.

3) Pulley material classification: a steel pulley with spherical bearings, the second nylon wheel with plain bearings,aluminum alloy wheel with sliding bearings.

 

Specifications

Serial No. Material

Length

(mm)

Width

(mm)

Height

(mm)

wheel diameter

(mm)

wheel width(mm)

weigth

(kg)

ST- 8603 Q235 carbon steel frame & aluminum roller / nylon roller 330 230 260 130-150 160-180 5
ST-8601 Q235 carbon steel frame & aluminum roller / nylon roller 530 300 300 130-150 160-180 8

Packing

FAQ

1. What is the MOQ of cable roller/cable pulley?
The MOQ is 10 pcs.
2.What is the lead time?
The lead time is around 10 days to 15 days, based on your quantity.
3. Can you offer the samples,how can we get ?
Yes,we can offer samples for you testing the quality, you may pay for the freight and sample cost.
4. Can you offer customize?
Yes, we can customize for any kinds of cable roller.
5. How can we choose the shipping way?
For the small order,we suggest to ship by DHL,FEDEX,UPS door to door service. It will take 3-5days.
For the larger order,we suggest to ship by sea.If urgent,you can als choose air shipping.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company SUZHOU SHENHONG IMPORT AND EXPORT CO.,LTD
Location Tanjietang,Xinhe Village,Yetang,Shanghu Town,Chagnshu City,Jiangsu Province,China
Contact Person Judy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.