Dongguan Zehui machinery equipment co., ltd
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

Semi Auto Low Pressure Polyurethane Foaming Machine For Mattress And Sofa

Price Negotiable
Price: inquiry
MOQ: one set
Delivery Time: 45 days
Brand: ZHMACH
Product Description

Auto Low Pressure Polyurethane Foaming Machine For Foaming Mattress and Sofa

Quick Detail of PU Foam Making Machine

 

ZHQG-YM03 Discharge pressure sponge machine
1,Pressure sponge size: 1250mm
2,Pressure thickness:0-200mm
3,Pressure foaming speed:0-60m/min(Frequency converter timing)
4,The diameter of the upper pressure roller:400mm.There are six groups of upper pressure rollers. Each pressure roller group consists of 11 pressure rollers forming a wheel sheet, evenly distributed. These two groups are staggered at intervals of 36
5. The lower press rollers are 260 mm in diameter, in six groups. The spacing is equal to that of the upper rollers and is opposite to the upper rollers. The rollers are equipped with a sponge conveyor belt, specification: W1250 * 4498mm (ring belt)
6,Outfeed conveyor frame: W1250 *L360mm
7,Exterior dimensions of machine:Ll2500 * W1960 * H1400mm
8,Total power:7.5KW

 

Main collocates and material chooses:

 
Material pot types: (The work pressure in the pot is normal pressure)

 

Type Use

Specification

Qty
Big material tank PPG+mixture material 3m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system 1
Big material tank TDI 2m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system

1
 

Big material tank MC

1m³/δ2mm stainless steel

1
Small material tank Si,T9,A33,Color 80L/δ1mm stainless steel 4


Transducer Types
 

Model Power/kw

Use

Qty Brand
VFD-B 11

Mixing head

1 Delta
VFD-B 5.5

PPG

1 Delta
VFD-B 3.7

TDI

1 Delta
VFD-B 2.2

MC

1 Delta
VFD-B 1.5 Si,T9,A33,Color

4

Delta
 

Motor types:

 
Model Power/kw

Use

Qty Brand
Y200L-2 11

Mixing head

1 Guangdong
Y132S-4 Horizontal 7.5

PPG

1 Guangdong
Y132S-4 Horizontal 3.7

TDI

1 Guangdong
Y100-4 Horizontal 2.2

MC

1 Guangdong
Y100-6 Horizontal 1.5

Ann, Si, Tin, Color,

4 Guangdong
Y100-4 Vertical 2.2

PPG material mixing

1 Guangdong
Y100-4 Vertical 1.5

TDI Mixing

1 Guangdong
Y100-4 Horizontal 2.2

PPG mixing

1 Guangdong
Y100-4 Horizontal 2.2

TDI filing

1 Guangdong

 

Our Services
 
We will help to design the layout of the machine that put in your factory.
We will send 2-4 experience engineers to install and testing the machines.
We will teach your engineer how to operate the machine and how to maintain the machines.
We will give you the machine operation manual and the best formulation for target products that you are going to make.
 
FAQ

 

Q: How many days for the install and testing of the machine?
 
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
 

 

 
 

  

Similar Products

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dongguan Zehui machinery equipment co., ltd
Location Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Contact Person Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.