Dongguan Zehui machinery equipment co., ltd
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu
Rubber & Plastics Recycled Plastic

Automatic Recycled Foam Production Line 10m³ Capacity with Steam Molding 16.7kW Power for Furniture Industry

Price Negotiable
Price: inquiry
MOQ: one set
Delivery Time: 30 days
Brand: ZHMACH
Product Description
Automatic Recycled Foam Production Line Overview
This industrial foam recycling system processes scrap foam into high-density rebonded foam blocks through automated crushing, mixing, and steam molding operations.
Production Process
The system integrates with foam crushing equipment to process scrap foam. Material is vacuum-transferred to mixing tanks, combined with adhesive for 15 minutes, then filled into molds and steam-cured for 30-40 minutes to complete each foam block.
Key Equipment Features
  • Complete integrated production line with stirring, mixing, and compression molding
  • Automatic steam molding increases production efficiency by 6 times
  • Hydraulic compression system ensures consistent foam density
  • Designed for furniture and shoe industry foam applications
Technical Specifications
Model ZHZS-10A ZHZS-10B (with steam)
Power 15kW 16.7kW
Stirring Capacity 10m³ 10m³
Stirring Speed 40r/min 40r/min
Hydraulic Pressure 12,000kg 12,000kg
Molding Tanks L2000×W1500×H1800mm (2pcs) L2000×W1500×H1000mm (1pcs)
System Type Without Steam With Steam
Operation Automatic Automatic
Product Images
Automatic recycled foam production line equipment overview Foam production line operational view showing mixing and molding components
Packaging & Shipping
Machines are shipped with nude packing for main components, supplemented by wooden cases for delicate parts. Additional protection includes paper or foam sheets with plastic film wrapping to ensure safe transit while optimizing freight costs.
Foam production line packaging and shipping preparation
Technical Support Services
  • Factory layout design consultation
  • On-site installation by 2-4 experienced engineers
  • Comprehensive operator training and maintenance guidance
  • Complete operation manuals and product formulation recommendations
  • 24-hour technical support for production issues
Frequently Asked Questions
How many days for machine installation and testing?
Installation typically requires 2 days with assistance from your technical staff. Our engineer will ensure the system is operational upon completion.
What are the engineer service costs?
Engineering support is available at USD50 per day per engineer, plus visa fees, round-trip tickets, and accommodation expenses.
What raw materials and tools are needed for testing?
We provide a comprehensive list of required testing materials and can assist with procurement if requested.
Can you provide long-term engineering support?
We can help hire experienced engineers for ongoing factory operations, with salary and terms negotiated directly.
How do we handle production issues after installation?
Contact our after-sales manager immediately with details or photos - we guarantee response and assistance within 24 hours.
Similar Products

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dongguan Zehui machinery equipment co., ltd
Location Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Contact Person Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.