ZHF-2017 Horizontal Continuous Foam Production Line | 18m Oven Length | 100-300kg/min Output | Automatic Polyurethane Foam Machine
Price:
inquiry
MOQ:
one set
Delivery Time:
45days after receive downpayment
Brand:
ZHMACH
Product Description
Product Overview
The ZHF-2017 Horizontal Continuous Foam Production Line is an advanced automated system for manufacturing flexible polyurethane foam used in furniture, footwear, packaging, electronics, garments, and transportation industries. This industrial-grade equipment is ideal for large-scale foam production operations.
Key Features
- Premium components including Siemens inverter/motor and U.S. Viking pump
- Foam density range: 8-100kg/m³ with lime powder addition capability
- High automation level with simple operation and low production costs
- Advanced PLC control system for continuous dual-formula foaming
- Adjustable oven side links and declining board height/width
Technical Specifications
| Parameter | Specification |
|---|---|
| Oven Length | 18m |
| Foam Height | 1.0-1.25m |
| Foam Width | 1.0-2.25m |
| Foam Density | 8-200kg/m³ |
| Total Power | 130KW |
| Conveyer Belt Speed | 0-8m/min |
| Total Output | 100-300kg/min |
| Machine Dimensions | L35 × W4.2 × H3.2m |
Material Tank Configuration
| Type | Material | Specification | Quantity |
|---|---|---|---|
| Big Material Tank | PPG | 5m³/δ5mm A3 steel plate with temperature control, stirrer, filter system | 1 |
| Big Material Tank | POP | 5m³/δ5mm A3 steel plate with temperature control, stirrer, filter system | 1 |
| Big Material Tank | CaCo3 | 5m³/δ5mm A3 steel plate with temperature control, stirrer, filter system | 1 |
| Big Material Tank | TDI | 5m³/δ5mm A3 steel plate with temperature control, stirrer, filter system | 1 |
| Big Material Tank | Flame Retardant | 2m³/δ3mm stainless steel with filter system | 1 |
| Small Material Tank | Various Additives | 180L/δ1mm stainless steel with filter systems | 7 |
Frequently Asked Questions
Installation and Testing Timeline
Complete installation requires approximately 30 days with 1-2 engineers, followed by 15 days for electrical connection and machine commissioning. Total timeline: 45 days.
Engineer Support Costs
Engineering support costs $40 per day per engineer, plus visa fees, round-trip tickets, and accommodation expenses.
After-Sales Technical Support
24-hour technical support available via phone or photo documentation for troubleshooting foam production and machine operation issues.
Equipment Images
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Dongguan Zehui machinery equipment co., ltd
Location
Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Contact Person
Wang