Auto Polyurethane Foam Machine Production Line 2500-6000 RPM with 200-350kg/min Output Capacity and CE Certificate
Price:
inquiry
MOQ:
one set
Delivery Time:
45days after receive downpayment
Brand:
ZHMACH
Product Description
Full-Automatic Continuous Polyurethane Foam Production Line
This industrial-grade horizontal continuous foaming system is engineered for high-volume production of furniture foam materials including sofa cushions and mattress components. The complete production line includes 13 raw material handling systems for comprehensive manufacturing capabilities.
Foaming Process Overview
- Automated loading of raw materials into temperature-controlled tanks
- Precise temperature regulation using integrated chiller systems
- Comprehensive flow verification and sample testing before production
- Continuous foaming with kraft paper and plastic film integration
Technical Specifications
| Parameter | Specification |
|---|---|
| Max Output Capacity | 200-350 kg/min (Continuous Type) |
| Mixer Total Power | 37 kW |
| Max Mixing Speed | 2500-6000 rpm |
| Foaming Type | Trough & Sprayer |
| Standard Material Groups | 13 Groups |
| Foaming Dimensions | W2300mm × H1300mm (Width Adjustable) |
| Control System | PLC Digital Touch Screen |
| Foaming Density Range | 8-150 kg/m³ |
| Total Motor Power | Approx 125 kW |
| Machine Net Weight | Approx 30 Tons |
| Floor Space Required | L45m × W5m × H4.5m |
Storage Tank Configuration
| Material Type | Capacity | Quantity |
|---|---|---|
| PPG Tank | 5 Ton | 1 Set |
| POP Tank | 5 Ton | 1 Set |
| TDI Tank | 5 Ton | 1 Set |
| MC Tank | 2 Ton | 1 Set |
| CaCO3 Tanks | 5 Ton | 1 Set |
| T-9/Amine/Color/Silicone/Water | 180L | 8 Sets |
Frequently Asked Questions
Q: How many days are required for machine installation and testing?
A: Installation requires approximately 30 days with 1-2 engineers, followed by 15 days for electrical connection and commissioning. Total commissioning time is 45 days.
Q: What are the costs for technical support engineers?
A: Engineering support costs USD 40 per day per engineer, plus visa fees, round-trip tickets, and accommodation expenses.
Q: How is technical support handled during production?
A: Our after-sales team provides 24-hour support via phone and digital communication to resolve any production or equipment issues.
Production Line Components
This CE-certified production system represents industrial manufacturing excellence with automated controls, precise material handling, and continuous operation capabilities for high-efficiency foam production.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Dongguan Zehui machinery equipment co., ltd
Location
Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Contact Person
Wang