Product Description
Automatic Continuous Foam Production Line

This industrial-grade continuous foaming machine is designed for high-volume production of flexible polyurethane foam used across multiple industries including furniture, footwear, packaging, electronics, apparel, and transportation sectors.

Key Technical Specifications
Parameter Specification Parameter Specification
Oven Length 18m Inner Conveyer Length 18m
Foaming Height 1.0-1.25m Side Board Adjustable Width 0.98-2.3m
Foaming Width 1.0-2.25m Conveyer Belt Speed 0-8m/min
Foaming Density 8-100kg/m³ Fall Plate Six section adjustable
Total Power 130KW Total Output 100-300kg/min
Advanced Control System
  • 13 material groups with PLC computer control interface
  • Foaming speed range: 2000-7000r/min
  • Dual formula capability for continuous production
  • Inverter-controlled foaming synchronized with production line
  • Adjustable oven declining board height and width via control box
  • 37kW mixing-head motor for consistent material processing
Drive System Components
Model Power Application Quantity Brand
G120 37kW Mixing Head 1 Siemens
G120 7.5kW POP, CaCo3 2 Siemens
G120 5.5kW PPG 1 Siemens
G120 4kW TDI, Flame Retardant 2 Siemens
G120 2.2kW MC, Color 2 Siemens
G120 1.5kW Water, Ann, Si, Tin, Anti-yellow 7 Siemens
G120 0.75kW Spray Head 1 Siemens
VFD-B 5.5/3.7/1.5kW Oven Conveyer & Cutting 3 Delta
Frequently Asked Questions
How many days are required for machine installation and testing?
Complete installation requires approximately 30 days with 1-2 engineers, followed by 15 days for electrical connection and machine commissioning. Total timeline: 45 days.
What are the engineer service costs?
Engineer service rate is USD50 per day per engineer, plus visa fees, round-trip tickets, and accommodation expenses.
What raw materials and tools are needed for testing?
A comprehensive testing materials list will be provided, with optional purchasing assistance available.
Can you provide ongoing technical support?
Yes, we can assist in hiring experienced engineers for ongoing factory operations, with salary and terms negotiated directly.
Product Images
Industrial continuous foam production line overview showing conveyor system and control panel Close-up view of foam machine mixing head and material dispensing components
Important Notes: Standard voltage: 380V, 50Hz, 3P (custom voltage available with 3% price adjustment). Delivery: 45 days after advance payment. Includes one-year warranty covering manufacturing defects with free replacement parts (transport costs borne by buyer).
Similar Products

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dongguan Zehui machinery equipment co., ltd
Location Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Contact Person Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.