Dongguan Zehui machinery equipment co., ltd
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

ZHF-2017-7 Semi-Auto Polyurethane Foaming Machine 43kW 230L Output for Mattress & Sofa Manufacturing

Price Negotiable
Price: inquiry
MOQ: one set
Delivery Time: 45 days
Brand: ZHMACH
Product Description
ZHF-2017-7 Semi-Automatic Polyurethane Foaming Machine

Professional industrial foaming equipment designed for manufacturing mattresses, sofas, and other polyurethane foam products with precision and efficiency.

Technical Specifications
  • Overall Dimensions: 2.8m × 1.5m × 2.5m
  • Foam Mold Size (adjustable): 1500-2000mm × 2000-3000mm × 1200mm (two sets)
  • Foaming Material Groups: 7 groups with human-machine interface control
  • Maximum Foaming Height: 1200mm
  • Foaming Density Range: 8-100 kg/m³
  • Foaming Speed: 2000-7000 rpm
  • Maximum Output: 230L per cycle
  • Mixing Head Motor: 11kW
  • Total Power Consumption: Approximately 43kW
Material Tank Configuration
Type Use Specification Quantity
Big Material Tank PPG + Mixture Material 3m³, δ5mm A3 steel plate with temperature control, stirrer, filter system 1
Big Material Tank TDI 2m³, δ5mm A3 steel plate with temperature control, stirrer, filter system 1
Big Material Tank MC 1m³, δ2mm stainless steel 1
Small Material Tank Si, T9, A33, Color 80L, δ1mm stainless steel 4
Transducer System
Model Power (kW) Use Quantity Brand
VFD-B 11 Mixing Head 1 Delta
VFD-B 5.5 PPG 1 Delta
VFD-B 3.7 TDI 1 Delta
VFD-B 2.2 MC 1 Delta
VFD-B 1.5 Si, T9, A33, Color 4 Delta
Motor Configuration
Model Power (kW) Use Quantity Brand
Y200L-2 11 Mixing Head 1 Guangdong
Y132S-4 Horizontal 7.5 PPG 1 Guangdong
Y132S-4 Horizontal 3.7 TDI 1 Guangdong
Y100-4 Horizontal 2.2 MC 1 Guangdong
Y100-6 Horizontal 1.5 Ann, Si, Tin, Color 4 Guangdong
Y100-4 Vertical 2.2 PPG Material Mixing 1 Guangdong
Y100-4 Vertical 1.5 TDI Mixing 1 Guangdong
Y100-4 Horizontal 2.2 PPG Mixing 1 Guangdong
Y100-4 Horizontal 2.2 TDI Filing 1 Guangdong
Professional Services
  • Factory layout design consultation
  • On-site installation and testing by 2-4 experienced engineers
  • Comprehensive operator training and maintenance guidance
  • Complete machine operation manual and product formulation support
Technical Support & After-Sales Service
  • 45-day complete installation and commissioning period
  • 24-hour technical support response for operational issues
  • Engineer placement assistance for ongoing factory operations
  • Comprehensive testing material and tool preparation guidance
ZHF-2017-7 Semi-Automatic Polyurethane Foaming Machine for mattress and sofa production
Similar Products

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dongguan Zehui machinery equipment co., ltd
Location Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Contact Person Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.