293-1136 Excavator Controller with 235-8873 Wire Harness for E312D E313D E318D E320D Parts
Price:
Please send mail or WhatsApp
MOQ:
1
Delivery Time:
1 Works day
Brand:
JIAJUE
Product Description
293-1136 Excavator Controller with 235-8873 Wire Harness
High-quality engine controller computer board designed for optimal performance and reliability in E312D, E313D, E318D, and E320D Excavator applications within construction machinery.
Product Specifications
| Part Number | 293-1136 / 235-8873 |
| Brand | JIAJUE |
| Compatible Models | E312D, E313D, E318D, E320D Excavator |
| Condition | NEW |
| Availability | Rich Stock |
| Approximate Weight | 3KG |
| Dimensions | 20cm x 30cm x 8cm |
| Delivery Time | 1-3 days after payment |
| Shipping Methods | DHL, FedEx, TNT, UPS |
| Dispatch Time | 24-48 hours |
| Payment Options | TT, Western Union, Credit Card, PayPal |
Product Testing & Quality Assurance
Compatible Equipment
Installation Requirements
- Physical Installation: 15-30 minutes (secured by 4 bolts on engine cool side)
- Programming & Testing: 30-60 minutes
Professional Tip: Pre-programmed ECUs based on your machine serial number are essentially "Plug & Play." Otherwise, Cat ET tool required for software flashing. Professional installation recommended for proper parameter synchronization.
ECM Failure Diagnosis
- ET diagnostic tool cannot communicate or displays "Module Not Responding" error
- Persistent fault codes related to internal memory or voltage reference after wiring harness inspection
- Sudden engine stalling, severe power loss (Limp Mode), or persistent misfiring after sensor/harness elimination
- Visible damage: overheating signs, water ingress, corrosion, or broken connector pins
Payment & Order Information
Payment Methods: T/T, L/C, PayPal, Western Union, Credit Card
Stock Availability: Rich stock maintained
Order Tracking: Tracking number provided upon shipment; bill of lading available for sea/air freight
Step-by-Step Testing Guide
Critical Note: HEUI (Hydraulic Electronic Unit Injection) systems are extremely sensitive to contamination. Even minor dust particles can cause premature failure.
- Preparation: Turn off excavator and secure safely. Disconnect battery to prevent electrical accidents.
- Inspection: Check ECU for physical damage or loose connections.
- Diagnostic Connection: Connect manufacturer-recommended diagnostic tool to ECU following tool instructions.
- Code Reading: Use diagnostic tool to read error codes (DTCs) stored in ECU.
- Live Data Check: Monitor live data parameters including sensor readings and system voltages. Verify normal ranges.
- Functional Testing: Perform component activation tests and sensor input simulations. Confirm proper ECU response without delays or errors.
- Reset Procedure: Reset ECU if manufacturer-recommended, particularly after repairs or replacements.
- Documentation: Maintain complete records of all tests, codes, and results for future reference.
Pre-Replacement Checklist
Before replacing ECM, always verify fuses, main relays, and ground connections. Faulty ground wires or low battery voltage often mimic ECM failure symptoms.
Customer Feedback
Company Profile
Industry Exhibitions
Manufacturing Facilities
Packaging & Shipping
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
GUANGZHOU JIAJUE TRADING CO.,LTD
Location
Room 315-316,Third Floor,NO.1020,Zhongshan AV.,Tianhe District,Guangzhou City,China
Contact Person
Jack Hoo