450mm PE Water Gas Supply Drainage Distribution Sewage Electric Conduit Plastic Extruder Making Machine

Price Negotiable
Price: negotiation
MOQ: 1 SET
Delivery Time: 45 WORKING DAYS
Brand: LB
Product Description

450mm PE Water Gas Supply Drainage Distribution Sewage Electric Conduit Plastic Extruder Making Machine

 

APPLICATION:

160-450mm PE Pipe Extrusion machine is mainly used for producing gas supplying pipe, water supplying pipe, cable protection pipe etc. The pipe has some excellent features such as low temperature impact resistance, reliable connection, good stress crack resistance, good chemical resistance, good wear resistance, long using life, etc. our extrusion line is designed with high efficiency extruder and equipped with reducer which is high speed and low noise, Gravimetric dosing unit and ultrasonic thickness indicator can be assembled according to customer's demand to ascend the precise of the pipes . Turn key solution can be provided, like laser printer crusher, shredder, water chiller, air compressor etc. to achieve high-grade and automatic tube production.

 

PE PIPE PRODUCTION SPECIFICATIONS:

Model Pipe diameter Extruder Extruder power Capacity
LB-63 20-63 SJ65/33 55AC 150
LB-110 20-110 SJ65/33 55AC 150
LB-160 75-160 SJ75/33 90AC 280
LB-250 90-250 SJ75/33 110DC 350
LB-315 110-315 SJ90/33 160DC 450
LB-450 160-450 SJ90/33 160DC 450
LB-630 315-630 SJ120/33 280DC 850
LB-800 500-800 SJ150/33 315DC 1100
LB-1200 710-1200 SJ150/34 400DC 1350

 

 

Technological processes

Raw material+ Master Batches → Mixing → Vacuum Feeder →Plastic Hopper Drier→ Single Screw Extruder →Co-extruder for color string & Multi Layers → Mould → Vacuum Calibration Tank → Spray Cooling Water Tank → Haul-off → No Dust Cutter →Stacker → Final Product Inspecting &Packing

 

Material Feeding & Drying

High-quality PE resin (HDPE/MDPE) is loaded into the hopper, then dried (if necessary) to remove moisture for optimal extrusion.

 

Extrusion & Melting

The material is fed into the extruder barrel, where a rotating screw heats and melts it (160–220°C) into a homogeneous molten state.

 

PE pipe Mold

common speed and high speed design

 

Cooling & Sizing

The pipe enters a vacuum calibration tank for rapid cooling and dimensional stabilization, ensuring consistent size and roundness.

 

Hauling & Cutting

Pullers grip the pipe, maintaining tension while it’s cut to specified lengths by an automatic saw.

 

Inspection & Stacking

Pipes undergo quality checks (pressure, thickness, surface finish) before being stacked or coiled for packaging.

 

Packaging & Storage

Finished pipes are labeled, packed, and stored for shipment.

 

Advantages:
1. Municipal water supply, gas supply and agriculture etc.
2. Commercial & Residential water supply
3. Industrial liquids transportation
4. Sewage treatment
5. Food and chemical industry
7. Replacement of cement pipes and steel pipes
8. Argillaceous silt, mud transportation
9. Garden green pipe networks

 

  

 

PRE- AND AFTER-SALE SERVICES

• A great wealth of experience,

• A consistent focus on the highest quality

• A complete twin pipe vacuum sizing system;

• Controlled independently unitary structure twin pipe hauling mechanism and synchronous cutting device;

• Optional length set and accurate adaption stacker.

• A highly motivated team

• Sophisticated process technology

• Customized solutions

 

Our factory

 

Our exhibition

 

Our goods shipping

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhangjiagang Langbo Machinery Co. Ltd.
Location No.99 LEFENG ROAD, LEYU TOWN, ZHANGJIAGANG, CHINA
Contact Person YIN

Request A Quote

Please check your email address.
Your message must be at least 20 characters.