201 Cold Rolled Stainless Steel Strips Price
201 Cold Rolled Stainless Steel Strips Price
Material :
mainly201, 202, 304, 304L, 304H, 316, 316L,316Ti,2205, 330, 630, 660, 409L, 321, 310S, 410, 416, 410S, 430, 347H, 2Cr13, 3Cr13 etc
300series:301,302,303,304,304L,309,309s,310,310S,316,316L,316Ti,317L,321,347
200series:201,202,202cu,204
400series:409,409L,410,420,430,431,439,440,441,444
Others:2205,2507,2906,330,660,630,631,17-4ph,17-7ph, S318039 904L,etc
Duplex stainless steel:S22053,S25073,S22253,S31803,S32205,S32304
Special Stainless Steel:904L,347/347H,317/317L,316Ti,254Mo
| ASME, ASTM, EN, BS, GB, DIN, JIS etc |
|
Product Name
|
Stainless steel coil/belt
|
|||
|
Thinckness
|
Cold rolled:0.15mm-10mm
Hot rolled: 3.0mm-180mm |
|||
|
Finish
|
2B, 2D, 4B, BA, HL, MIRROR, brush, NO. 1-NO. 4, 8K, and so on
|
|||
|
Widthness
|
8-3000mm
|
|||
|
Length
|
1000mm-11000mm or as customer' s requirement
|
|||
|
Standard
|
||||
|
Package
|
clients' requirement and Standard export sea-worthy packing
|
|||
|
Delivery time
|
3-15 days subject to the clients' requirement and quantity
|
|||
Application
Furniture
Production tools, Kitchen appliances, freezers, cold rooms
Auto Parts
Machinery and Packaging
Equipment and Medical devices
Transport system

There are usually two ways to cool a galvanized cooling tower: air-cooled and water-cooled.
1. The galvanized sheet is immersed in a molten zinc bath to adhere a thin layer of zinc to the surface. It is mainly produced by continuous galvanizing process, that is, the coiled steel plate is continuously immersed in a zinc-plated plating tank to form a galvanized steel sheet; the alloyed galvanized sheet. This steel sheet is also produced by hot dip, but immediately after it is discharged, it is heated to about 500 ° C to form an alloy coating of zinc and iron. This galvanized sheet has good adhesion and weldability of the coating.
2. Galvanized sheets can be divided into two types: in-line annealing and off-line annealing according to different annealing methods, and they are called protective gas method and flux method.
Packaging & Shipping
Packing Details : Covered with a layer of plastic film and cardboard,packed on the wooden pallets/ iron packing,bound with iron belt,loaded in the containers.
Delivery Details : within 15 days after the deposit.
The company has modern professional metal processing machines of which the 90% are imported from Japan and Germany. Such as Water Jet machine,Cold/Hot Rolled production line,laser cutting machine,hailrine machine which can provide cutting ,slitting ,polished ,OEM and ODM service for our clients.
Package
Related Goods
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

