HORIZON FORMWORK CO., LTD.
                                                                                                           
Verified Supplier
20 Years
Since 2006
Menu

Construction Wall Forming Systems with Top Scaffold Brackets as Safety Platform

Price Negotiable
Price: pls ask HORIZON
MOQ: 500 PCS
Delivery Time: 20-25 days
Brand: HORIZON
Product Description

Construction Wall Forming Systems with Top Scaffold Brackets as Safety Platform

 

Personnel safety is always the first important thing when assembling and using the formwork systems. The top scaffold brackets perform as stable and safe working platforms at high elevations, especially for workers when pouring concrete or installing different elements on top of the formwork.

 

These work should be carried out from safe and stable work platforms that prevent workers falling.

 

Using the top scaffold bracket, working and concreting platforms are mounted to the wall formwork. This consists of: top scaffold bracket, planks, steel pipes and pipe couplers.

 

Normally, the top scaffold brackets for the working platform, are fixed to the vertical H20 timber beams.


Wall Formwork Components:

Components Specification / description
Wall formwork panel For all vertical formworks
H20 Timber beam

Water proof treated
Height: 200mm
Width: 80mm
Length: as per table size

Steel waling

Painted, powder coated
[12 steel channel

Flange clamp

Galvanized
To connect steel waling and H20 beams

Panel strut

Painted
help formwork panel erection

Waling connector 80

Painted
Used for formwork panels alignment

Corner connector 60x60

Painted
Used for forming inner corner formwork with wedge pins

Top scaffold bracket

Painted,
severs as safety working platform

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company HORIZON FORMWORK CO., LTD.
Location HUSTPARK BUILDING NO. 4, ZHONGXING ST. XINGTAI, HEBEI, CHINA
Contact Person H. Chang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.