Aluminum Standing Seam Metal Roof Machine 8 - 12 M / Min Production Capacity
Aluminum Metal Roof Ridge Cap Making Machine 45#Steel Shaft 8-15M/Min
| Technical parameters: | |||||||
| 1 | Name of commodity & specification | XN-312 ridge tile roll forming machine | |||||
| 2 | Main motor power | 4kw, 3 phase | |||||
| 3 | Hydraulic motor power | 3kw | |||||
| 4 | Hydraulic Pressure | 10-12MPa | |||||
| 5 | Voltage | 380V /3phase/ 50 HZ (or as your requirement) | |||||
| 6 | Control System | PLC Delta Inverter | |||||
| 7 | Main Frame | 400mm H-Beam | |||||
| 8 | Backboard Thickness | 18mm | |||||
| 9 | Chain Size | 33mm | |||||
| 10 | Feeding Material | color steel coils | |||||
| 11 | Feeding Thickness | 0.3-0.8mm | |||||
| 12 | Feeding Width | 600mm | |||||
| 13 | Effective width | 312mm | |||||
| 14 | Productivity | 4-8m/min | |||||
| 15 | Roll Station | 14 | |||||
| 16 | Roller Diameter | 65mm | |||||
| 17 | Roller material | 45# steel | |||||
| 18 | Cutter material | Cr12 , quenched | |||||
| 19 | Cr-Plating Size | 0.05mm | |||||
| 20 | Overall Size | 7500×1000×1200mm | |||||
| 21 | Total Weight | 3T | |||||
| 22 | Components | Manual Uncoiler-------------------1 set Guiding Platform------------------1 set Coil Strip Leveler------------------1 set Main Machine of Roll Forming------1 set Electric-Motor---------------------1 set Glazed Tile Pressing Device--------1 set Cutting Device--------------------1 set Hydraulic Station------------------1 set PLC Control-----------------------1 set Supporter Table-------------------1 set |
|||||
| 23 | Workflow | Manual decoiling----feeding and guiding----roll forming----pressing----cut to length----run out table | |||||
| 24 | Package | nude in the container | |||||
| 25 | Minimum order quantity | 1 set | |||||
| 26 | Payment terms | T/T(30% T/T pay in advance, the remaining 70% pay before ship) | |||||
| 27 | Delivery time | 30 working days later after receiving the deposit | |||||
| All technical parameters can be changed, according to user's need. | |||||||
Terms of Payment: 30% of the total contract value paid by T/T as down payment, the rest 70% of the total contract value to be paid by T/T after inspection by buyer in seller's factory while before delivery.
Delivery: 30 days after receipt of advance payment
Service: we send technician to your country to fix the machine.The buyer should bear all the cost including: visa, Roundtrip tickets and suitable accommodation, also buyer should pay salary 60USD/day.
Warranty: 12 months limited warranty
During warranty: parts are free but buyer pay for the shipping fee
1: How to play order: Inquiry---confirm the profile drawings and price----confirm the PI---arrange the deposit or L/C---then OK
2: How to visit our company:
Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),
then we can pick up you.
Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.
3: When we exported the machines:
We have beening making and exporting the machines since from the year of 1998.
4: If you want to get more pictures or videos of the machines,I can send them to you by
Email or SKype.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
